Laserfiche WebLink
3rd Interim Action Construction Report <br />Kimberly-Clark Upland Site <br /> <br />Construction Report <br />3rd Interim Action <br />Kimberly-Clark Worldwide Site Upland Area <br />Port of Everett <br />Everett, Washington <br /> <br /> <br /> <br /> <br />This document was prepared by, or under the direct supervision of, the technical professionals noted <br />below. <br /> <br /> <br /> <br /> <br />Document prepared by: Dylan Frazer, LG <br /> Project Manager; Senior Associate <br /> <br /> <br /> <br /> <br />Document reviewed by: Ken Reid, LEG <br /> Quality Reviewer; Senior Associate <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Date: July 30, 2024 <br />Project No.: 0121049.080.084 <br />File path: P:\121\049\R\3rd IA Implementation Report\Landau MIE KC 3rd IA Implementation Report_Final 073024.docx <br />Project Coordinator: LJL