My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-3_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-3_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 3:50:03 PM
Creation date
4/22/2026 3:00:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3rd Interim Action Construction Report <br />Kimberly-Clark Upland Site <br /> 0121049.080.084 <br />July 30, 2024 2-10 landauinc.com <br />Well Name Ecology Tag ID Well Diameter Decommission Date <br />REC1-MW-5 BHS 334 2-inch October 14, 2021 <br />REC1-MW-8 BHS 325 ¾-inch October 14, 2021 <br />REC1-MW-9 BHS 326 2-inch October 14, 2021 <br />REC7-MW-4 BHE 801 2-inch October 14, 2021 <br />MW-1 BHM 187 1-inch October 14, 2021 <br />MW-2 BHM 188 1-inch October 14, 2021 <br />SHB-MW2 BIE 369 2-inch October 14, 2021 <br />UST71-MW-102 BIP 814 2-inch October 14, 2021 <br />UG-MW-1 BHE 991 2-inch October 21, 2022 <br />Unknown well N/A 1-inch October 22, 2022 <br />2.7 Security Fencing <br />Demolition of the existing Site fence and installation of new security fencing was completed to maintain <br />vector control and to prevent human contact with residual Site contamination. Security fencing details <br />are shown on Sheets C 6.1 through C6.6 of the as-builts (Appendix A).
The URL can be used to link to this page
Your browser does not support the video tag.