My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-4_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-4_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 4:33:22 PM
Creation date
4/22/2026 3:55:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.4
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1719
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
OMS-B-3-1-2- <br />070512 <br />OMS-B-3-2-3- <br />070612 <br />CONCRETE SLAB FLOOR <br />FILL <br />Slightly moist, brown, slightly sandy GRAVEL (GP); <br />perdominantly coarse gravel with sandy and cobbles; <br />recycled concrete rubble. <br />Bottom of boring at 3 ft BGS. Backfilled boring with <br />same material that was pulled from hole. <br />Sampler Type: <br />Approved by: <br />Material <br />Type <br />Water Level (ATD) <br />Aspect / Hand Auger <br />GLPID - Photoionization Detector (Headspace Measurement) <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />Figure No. <br />Tests <br />A- 149_ENV BORING LOG KIMBERLY CLARK-EVERETT.GPJ July 31, 2014OMS-B-3 <br />Static Water Level <br />Driller/Method: <br />Sample <br />Type/ID <br />Depth to Water (ft BGS) <br />110207 <br />Location: <br />Borehole Completion <br />1 of 1 <br />Logged by: <br />SJG <br />Kimberly Clark <br />Project Number <br />Grab Sample <br />Boring Log <br />Depth <br />(ft) <br />Boring Number <br />No Recovery <br />Continuous Grab Start/Finish Date <br />Depth / <br />Elevation <br />(feet) <br />Sampling Method: <br />Sheet <br />Description <br /> Everett, WA <br />Project Name: <br />Blows/ <br />6" <br />Ground Surface Elev. <br />7/5/2012-7/6/2012 <br />PID <br />(ppm)
The URL can be used to link to this page
Your browser does not support the video tag.