My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay BID PROPOSAL: BID ITEM TABLE <br />PW# 3860 March 10, 2026 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the <br />unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform <br />thereto. All entries must be typed or entered in ink. <br /> <br />BID SCHEDULE 2026 Pavement Maintenance Overlay WO# 3860 <br /> <br /> BIDDER:____________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />Base Bid – Schedule A: Multiple Streets <br />1 Mobilization LS 1 $_______.___ $______________.___ <br />2 Flaggers (Minimum Bid Prevailing Wage) Hour 3,245 $_______.___ $______________.___ <br />3 Uniformed Police Officer Hour 240 $_______.___ $______________.___ <br />4 Project Temporary Traffic Control LS 1 $_______.___ $______________.___ <br />5 Portable Changeable Message Sign Hour 1,866 $_______.___ $______________.___ <br />6 Planing Bituminous Pavement 2” Deep SY 82,749 $_______.___ $______________.___ <br />7 Additional Planing Bituminous Pavement SY 12,420 $_______.___ $______________.___ <br />8 HMA Class 1/2 Inch, PG 64-22 Ton 10,139 $_______.___ $______________.___ <br />9 Street Cleaning HR 190 $_______.___ $______________.___ <br />10 Adjust Manhole Each 37 $_______.___ $______________.___ <br />11 Adjust Catch Basin/Inlet to Grade Each 63 $_______.___ $______________.___ <br />12 Adjust Valve Box to Grade Each 29 $_______.___ $______________.___ <br />13 <br />Adjust Existing Monument Castings to <br />Grade Each 14 $_______.___ $______________.___ <br />14 Plastic Wide Line LF 18,890 $_______.___ $______________.___ <br />15 Plastic Line LF 40,480 $_______.___ $______________.___ <br />16 24” Plastic Crosswalk Line SF 3,060 $_______.___ $______________.___ <br />17 24” Plastic Stop Line LF 460 $_______.___ $______________.___ <br />18 Plastic Traffic Arrow Each 6 $_______.___ $______________.___ <br />19 Plastic Traffic Letter Each 4 $_______.___ $______________.___ <br />20 Plastic Bicycle Lane Symbol Each 22 $_______.___ $______________.___
The URL can be used to link to this page
Your browser does not support the video tag.