My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br />2026 Pavement Maintenance Overlay Table of Contents for Special Provisions <br />PW# 3860 TOC SP - 3 March 5, 2026 <br />1 DIVISION 5 <br />2 SURFACE TREATMENTS AND PAVEMENTS <br />3 Hot Mix Asphalt-----------------------------------------------------------------------------------------49 <br />4 DIVISION 7 <br />5 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />6 SEWERS, WATER MAINS, AND CONDUITS <br />7 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS--------------------------------77 <br />8 Construction Requirements -------------------------------------------------------------------------77 <br />9 Adjusting Manholes and Catch Basins to Grade-----------------------------------------------77 <br />10 Adjusting Valve Boxes to Grade -------------------------------------------------------------------78 <br />11 7-05.4 Measurement --------------------------------------------------------------------------------78 <br />12 7-05.5 Payment---------------------------------------------------------------------------------------79 <br />13 DIVISION 8 <br />14 MISCELLANEOUS CONSTRUCTION <br />15 EROSION CONTROL AND WATER POLLUTION CONTROL ----------------------------80 <br />16 8-01.3(1)A Submittals--------------------------------------------------------------------------------80 <br />17 8-01.3(8)Street Cleaning-----------------------------------------------------------------------------80 <br />18 RAISED PAVEMENT MARKERS------------------------------------------------------------------81 <br />19 MONUMENT CASES---------------------------------------------------------------------------------82 <br />20 8-13.1 Description-------------------------------------------------------------------------------------82 <br />21 8-13.2 Vacant ------------------------------------------------------------------------------------------82 <br />22 8-13.3 Construction Requirements ---------------------------------------------------------------82 <br />23 8-13.4 Measurement ---------------------------------------------------------------------------------82 <br />24 8-13.5 Payment----------------------------------------------------------------------------------------83 <br />25 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT TRANSPORTATION <br />26 SYSTEMS, AND ELECTRICAL---------------------------------------------------------------83 <br />27 Materials--------------------------------------------------------------------------------------------------83 <br />28 Fiber Optic Cable, Electrical Conductors, and Cable-----------------------------------------83 <br />29 Construction Requirements -------------------------------------------------------------------------84 <br />30 Signal Systems-----------------------------------------------------------------------------------------84 <br />31 Signal Controllers--------------------------------------------------------------------------------------84 <br />32 Induction Loop Vehicle Detectors------------------------------------------------------------------84 <br />33 8-20.4 Measurement ---------------------------------------------------------------------------------85 <br />34 8-20.5 Payment----------------------------------------------------------------------------------------86
The URL can be used to link to this page
Your browser does not support the video tag.