Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 66 March 5, 2026 <br />1 of the compaction train. The test point evaluation shall be performed in accordance with <br />2 instructions from the Engineer. The number of passes with an approved compaction train, <br />3 required to attain the maximum test point density, shall be used on all subsequent paving. <br />4 <br />5 HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel <br />6 ruts shall be compacted with a pneumatic tire roller unless otherwise approved by the <br />7 Engineer. <br />8 <br />9 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation Acceptance Testing <br />10 The location of the HMA compaction acceptance tests will be randomly selected by the <br />11 Engineer from within each sublot, with one test per sublot. <br />12 <br />13 5-04.3(10)D3 HMA Nonstatistical Compaction Price Adjustments <br />14 For each compaction lot with one or two sublots, having all sublots attain a relative <br />15 density that is 92 percent of the reference maximum density the HMA shall be accepted at <br />16 the unit Contract price with no further evaluation. When a sublot does not attain a relative <br />17 density that is 92 percent of the reference maximum density, the lot shall be evaluated in <br />18 accordance with Section 1-06.2 to determine the appropriate CPF. The maximum CPF <br />19 shall be 1.00, however, lots with a calculated CPF in excess of 1.00 will be used to offset <br />20 lots with CPF values below 1.00 but greater than 0.90. Lots with CPF lower than 0.90 will <br />21 be evaluated for compliance per 5-04.3(11). Additional testing by either a nuclear <br />22 moisture-density gauge or cores will be completed as required to provide a minimum of <br />23 three tests for evaluation. <br />24 <br />25 For compaction below the required 92%, a Non-Conforming Compaction Factor (NCCF) <br />26 will be determined. The NCCF equals the algebraic difference of CPF minus 1.00 <br />27 multiplied by 40 percent. The Compaction Price Adjustment will be calculated as the <br />28 product of CPF, the quantity of HMA in the compaction control lot in tons, and the unit <br />29 Contract price per ton of mix. <br />30 <br />31 5-04.3(11) Reject Work <br />32 <br />33 5-04.3(11)A Reject Work General <br />34 Work that is defective or does not conform to Contract requirements shall be rejected. <br />35 The Contractor may propose, in writing, alternatives to removal and replacement of <br />36 rejected material. Acceptability of such alternative proposals will be determined at the sole <br />37 discretion of the Engineer. HMA that has been rejected is subject to the requirements in <br />38 Section 1-06.2(2) and this specification, and the Contractor shall submit a corrective <br />39 action proposal to the Engineer for approval. <br />40 <br />41 5-04.3(11)B Rejection by Contractor <br />42 The Contractor may, prior to sampling, elect to remove any defective material and replace <br />43 it with new material. Any such new material will be sampled, tested, and evaluated for <br />44 acceptance. <br />45