My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 4/27/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 4/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:52:27 PM
Creation date
4/29/2026 12:50:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
4/27/2026
Council Approval Date
4/22/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Klayton Leingang
Subject / Project Title
North Broadway Pedestrian Bridge final design plans, specifications, and estimate
Tracking Number
0005233
Total Compensation
$3,059,270.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Fee Proposal - Summary of Total Costs <br />3/3/2026 <br />Kimley-Horn S&W HWA Ott Sakai Willamette <br />STAFF HOURS STAFF HOURS STAFF HOURS STAFF HOURS STAFF HOURS <br />Everett North Broadway Pedestrian Bridge <br />TEAM MEMBER FIRM TOTAL <br />104.5 Geotechnical Reporting 116 116 <br />104.6 Geotechnical PS&E Coordination and Support 0 0 <br />0 0 598 0 0 598 <br />Task 105 Environmental Coordination and Permitting (Phase 1) <br />105.1 Project Management + Administration 90 90 <br />105.2 Hazardous Materials/Contamination 152 152 <br />105.3 NEPA Documentation 91 91 <br />105.4 ESA Documentation 40 40 <br />105.5 SEPA Documentation 140 140 <br />0 513 0 0 0 513 <br />Task 106 Cultural Resources <br />106.1 Background Research, APE Development, & Logistics 34 34 <br />106.2 Archaeological Field Survey 64 64 <br />106.3 Archaeological Monitoring of Geotechnical Investigations 36 36 <br />106.4 Reporting & Archaeological Site Form Update 69 69 <br />0 0 0 0 203 203 <br />Task 107 Alternatives Analysis (5-Months) <br />107.1 Alternatives Evaluation + Memo 278 32 310 <br />107.2 Site Visit 56 56 <br />107.3 Span configuration 74 74 <br />107.4 Accessibility Approach (ramps or elevators)118 118 <br />107.5 Bridge landing locations and pathways 120 120 <br />107.6 Level of Architectural and Aesthetic Treatment 88 88 <br />107.7 Bridge Visual Quality 394 394 <br />107.8 Stakeholder Input 66 66 <br />107.9 Conceptual Landscape 90 90 <br />107.1 Conceptual Roadway/Sidewalk 100 100 <br />107.11 Conceptual Stormwater Considerations 62 62 <br />107.12 Conceptual Construction Staging 46 46 <br />107.13 Traffic Analysis 136 136 <br />107.14 MOT Workshop 1 18 18 <br />107.15 MOT Workshop 2 0 0 <br />107.16 Conceptual MOT 262 262 <br />Subtotal <br />Subtotal <br />Subtotal <br />Everett North Broadway Ped Bridge Fee_20260303 Page 3 of 11 3/3/2026
The URL can be used to link to this page
Your browser does not support the video tag.