My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 4/27/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 4/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:52:27 PM
Creation date
4/29/2026 12:50:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
4/27/2026
Council Approval Date
4/22/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Klayton Leingang
Subject / Project Title
North Broadway Pedestrian Bridge final design plans, specifications, and estimate
Tracking Number
0005233
Total Compensation
$3,059,270.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Fee Proposal - Summary of Total Costs <br />3/3/2026 <br />Kimley-Horn S&W HWA Ott Sakai Willamette <br />STAFF HOURS STAFF HOURS STAFF HOURS STAFF HOURS STAFF HOURS <br />Everett North Broadway Pedestrian Bridge <br />TEAM MEMBER FIRM TOTAL <br />834 0 0 60 0 894 <br />Task 208 Bid Support (1-Month) <br />208.1 Bidder Questions 12 10 22 <br />208.2 Addendum 1 6 6 <br />208.3 Addendum 2 6 6 <br />208.4 Addendum 3 6 6 <br />208.5 Bid Opening 2 2 <br />208.6 Contractor Verification 1 1 <br />33 0 0 10 0 43 <br />Task 209 Construction Support <br />209.1 Preconstruction Meeting 4 4 <br />209.2 Request for Information (80)160 160 <br />209.3 Other Submittal Review and Responses (55)110 110 <br />209.4 EOR Review and Coordination 108 108 <br />209.5 Outreach graphics and communication materials (digital graphics, survey, postcard, website)118 118 <br />209.6 Contractor Coordination 0 0 <br />500 0 0 0 0 500 <br />SUBTOTAL PHASE 2 6363 52 0 396 0 6811 <br />TOTAL PHASE 1 + PHASE 2 10441 641 606 690 203 12581 <br />Subtotal <br />Subtotal <br />Subtotal <br />Everett North Broadway Ped Bridge Fee_20260303 Page 7 of 11 3/3/2026
The URL can be used to link to this page
Your browser does not support the video tag.