Laserfiche WebLink
Fee Proposal - Summary of Total Costs <br />3/3/2026 <br />Kimley-Horn S&W HWA Ott Sakai Willamette <br />STAFF HOURS STAFF HOURS STAFF HOURS STAFF HOURS STAFF HOURS <br />Everett North Broadway Pedestrian Bridge <br />TEAM MEMBER FIRM TOTAL <br />834 0 0 60 0 894 <br />Task 208 Bid Support (1-Month) <br />208.1 Bidder Questions 12 10 22 <br />208.2 Addendum 1 6 6 <br />208.3 Addendum 2 6 6 <br />208.4 Addendum 3 6 6 <br />208.5 Bid Opening 2 2 <br />208.6 Contractor Verification 1 1 <br />33 0 0 10 0 43 <br />Task 209 Construction Support <br />209.1 Preconstruction Meeting 4 4 <br />209.2 Request for Information (80)160 160 <br />209.3 Other Submittal Review and Responses (55)110 110 <br />209.4 EOR Review and Coordination 108 108 <br />209.5 Outreach graphics and communication materials (digital graphics, survey, postcard, website)118 118 <br />209.6 Contractor Coordination 0 0 <br />500 0 0 0 0 500 <br />SUBTOTAL PHASE 2 6363 52 0 396 0 6811 <br />TOTAL PHASE 1 + PHASE 2 10441 641 606 690 203 12581 <br />Subtotal <br />Subtotal <br />Subtotal <br />Everett North Broadway Ped Bridge Fee_20260303 Page 7 of 11 3/3/2026