Laserfiche WebLink
Fee Proposal - Summary of Total Costs <br />3/3/2026 <br />LABOR EXPENSES LABOR EXPENSES LABOR EXPENSES LABOR EXPENSES LABOR EXPENSES <br />Everett North Broadway Pedestrian Bridge <br />TOTALS&WKimley-Horn TOTAL <br />LABOR <br />TOTAL <br />EXPENSESTEAM MEMBER FIRM <br />HWA Ott Sakai Willamette <br />62,550$-$-$-$-$-$-$-$-$-$62,550$-$62,550$ <br />Task 203 Utility Coordination <br />203.1 Utility Investigation 400$-$400$-$400$ <br />203.2 Third-Party Utility Coordination Meetings 8,800$-$8,800$-$8,800$ <br />203.3 Third-Party Utility Design Coordination 6,800$-$6,800$-$6,800$ <br />16,000$-$-$-$-$-$-$-$-$-$16,000$-$16,000$ <br />Task 204 Environmental Coordination and Permitting (Phase 2) <br />204.1 Project Management + Administration -$-$3,760$-$3,760$-$3,760$ <br />204.2 NEPA 60% ESA meeting (virtual)-$-$3,176$-$3,176$-$3,176$ <br />204.3 City of Everett Construction Permit + Permit Coordination 4,880$-$5,834$-$10,714$-$10,714$ <br />4,880$-$12,770$-$-$-$-$-$-$-$17,650$-$17,650$ <br />Task 205 Intermediate (60%) Design Deliverable (4-Months) <br />205.1 Cover Sheet and Index 1,760$-$1,760$-$1,760$ <br />205.2 Legend, General Notes and Abbreviations 1,760$-$1,760$-$1,760$ <br />205.3 Survey Control and Existing Conditions 2,885$-$2,885$-$2,885$ <br />205.4 Typical Sections 7,500$-$7,500$-$7,500$ <br />205.5 Site Preparation Plans 9,720$-$9,720$-$9,720$ <br />205.6 Erosion Sediment Control Plans 9,720$-$9,720$-$9,720$ <br />205.7 Utility Plans 7,280$-$7,280$-$7,280$ <br />205.8 Drainage Plans 24,860$-$24,860$-$24,860$ <br />205.9 Structural Plans 225,870$-$225,870$-$225,870$ <br />205.1 Roadway Plans -$-$-$-$-$ <br />205.11 Sidewalk Plan and Profile 21,800$-$21,800$-$21,800$ <br />205.12 Illumination Plans 11,720$-$11,720$-$11,720$ <br />205.13 Architectural Features Plan 11,130$-$11,130$-$11,130$ <br />205.14 Landscape and Urban Design Plans 45,880$-$45,880$-$45,880$ <br />205.15 Maintenance of Traffic Plans 77,880$-$77,880$-$77,880$ <br />205.16 Updated Construction Cost Estimate 4,880$-$61,463$-$66,343$-$66,343$ <br />205.17 Draft Contract Documents 11,280$-$11,280$-$11,280$ <br />205.18 Draft Hydraulic Report 16,120$-$16,120$-$16,120$ <br />205.19 QA/QC 43,800$-$43,800$-$43,800$ <br />535,845$-$-$-$-$-$61,463$-$-$-$597,308$-$597,308$ <br />Task 206 Final (90%) Design Deliverable (3-Months) <br />206.1 Cover Sheet and Index 1,420$-$1,420$-$1,420$ <br />206.2 Legend, General Notes and Abbreviations 1,420$-$1,420$-$1,420$ <br />206.3 Survey Control and Existing Conditions 1,420$-$1,420$-$1,420$ <br />206.4 Typical Sections 3,860$-$3,860$-$3,860$ <br />206.5 Site Preparation Plans 5,000$-$5,000$-$5,000$ <br />206.6 Erosion Sediment Control Plans 5,000$-$5,000$-$5,000$ <br />206.7 Utility Plans 4,660$-$4,660$-$4,660$ <br />206.8 Drainage Plans 13,700$-$13,700$-$13,700$ <br />206.9 Structural Plans 157,340$-$157,340$-$157,340$ <br />206.1 Roadway Plans -$-$-$-$-$ <br />206.11 Sidewalk Plan and Profile 15,000$-$15,000$-$15,000$ <br />206.12 Illumination Plans 6,590$-$6,590$-$6,590$ <br />206.13 Architectural Features Plan 11,360$-$11,360$-$11,360$ <br />206.14 Landscape and Urban Design Plans 28,940$-$28,940$-$28,940$ <br />206.15 Maintenance of Traffic Plans 50,440$-$50,440$-$50,440$ <br />206.16 Updated Construction Cost Estimate 4,880$-$28,180$-$33,060$-$33,060$ <br />206.17 Draft Contract Documents 14,760$-$14,760$-$14,760$ <br />Subtotal <br />Subtotal <br />Subtotal <br />Subtotal <br />Everett North Broadway Ped Bridge Fee_20260303 Page 10 of 11 3/3/2026