Laserfiche WebLink
City of Everett 00 52 13 - 2 <br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 WO# UP-3815-02 <br />00 52 13 - 2 CONTRACT <br /> Vol 4 – 1: <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2090685&searchid <br />=a08f325d-6560-4350-998b-5003bd41e8c3&dbid=0 <br />This is a 1716-page pdf with first page containing City Clerk’s file <br />recordkeeping digital signature 2026.04.22 10:44:24 -07’00’ <br />Vol 4 – 2: <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2090779&searchid <br />=daa9f466-de34-4cbd-8077-aa22aaf102c6&dbid=0 <br />This is a 1718-page pdf with first page containing City Clerk’s file <br />recordkeeping digital signature 2026.04.22 10:50:22 -07’00’ <br />Vol 4 – 3: <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2090857&searchid <br />=5487f4b3-5ba7-4625-baec-bab7085221e1&dbid=0 <br />This is a 1716-page pdf with first page containing City Clerk’s file <br />recordkeeping digital signature 2026.04.22 11:09:57 -07’00’ <br />Vol 4 – 4: <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2090905&searchid <br />=4b99ce77-84d9-4ea3-a531-1d7ef7303b0f&dbid=0 <br />This is a 1719-page pdf with first page containing City Clerk’s file <br />recordkeeping digital signature 2026.04.22 11:13:59 -07’00’ <br />Addenda: <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=2090410&searchid <br />=a08f325d-6560-4350-998b-5003bd41e8c3&dbid=0 <br /> <br />This is a 178-page pdf with first page containing City Clerk’s file <br />recordkeeping digital signature 2026.04.22 12:17:13 -07’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted <br />Contract Documents as of the Bid Opening Date. City and Contractor further agree that <br />this pdf may contain some other documents (such as Reference Information) that are <br />not Contract Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within <br />Three Hundred Fifty-Eight (358) Working Days after the effective date of the Notice to <br />Proceed. Physical Completion shall be within Thirty (30) calendar days after the actual <br />date of issuance of Substantial Completion.