Laserfiche WebLink
I%- <br /> GENERAL NOTES STRUCTURAL NOTES SCOPE OF WORK Ya E <br /> a <br /> THE SCOPE OF THE PROJECT INCLUDES REPAIR OF FIRE J= d V <br /> A. CONSTRUCTION A.GYPSUM WALL BOARD as <br /> DAMAGE THAT RECENTLY OCCURRED TO BUILDING 38, UNIT A. 3u a o <br /> 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE THERE IS NO STRUCTURAL FIRE DAMAGE (CHAR) OBSERVED. 0 3 22 <br /> x <br /> FEDERAL, STATE AND CITY CODES AND ORDINANCES, INCLUDING FIRE 1. GYPSUM WALLBOARD TO CONFORM TO IBC SECTION 2506.ATTACH NON-STRUCTURAL ELEMENTS DAMAGED FROM FIRE INCLUDE '771 <br /> AND O.S.H.A REGULATIONS WHERE THE PROJECT IS LOCATED. INTERIOR FINISHES, INSULATION, AND OTHER INCIDENTAL <br /> TO FRAMING AT 6"O.C.AT ALL STUDS, TOP AND BOTTOM PLATES <br /> 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE THEMSELVES AND BLOCKING. ELEMENTS. MECHANICAL, ELECTRICAL, AND PLUMBING THAT <br /> WITH THE SITE AND EXISTING CONDITIONS AT THE PROJECT,AND VERIFY ARE INCIDENTAL TO THESE REPAIRS ARE NOT INCLUDED AND <br /> a. SINGLE LAYER GYPSUM WALLBOARD: 6D COOLER (0.092"X1-7/8" ARE BY OTHERS. <br /> ALL INFORMATION PROVIDED ON DRAWINGS. ALL SIGNIFICANT LONG, 1/4" HEAD) OR WALLBOARD NAIL (0.0915"X1-7/8" LONG, LEE T <br /> DEVIATIONS ARE TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 19/64" HEAD) OR 0.120" NAIL X1-3/4" LONG, 3/8" HEAD OR NO. 6 <br /> 3. ALL MATERIAL PROPERTIES SHALL BE NOTED IN SPECIFICATIONS, TYPE S OR W DRYWALL SCREWS 1-1/4"LONG. CODES AND PROVISIONS <br /> UNLESS NOTED ON DRAWINGS. <br /> 4. PRIOR TO FABRICATION OF ANY ASSEMBLIES OR PLACEMENT OF ANY B. ROUGH CARPENTRY 2021 INTERNATIONAL EXISTING BUILDING CODE(IEBC) 0 05 <br /> REPAIR MATERIAL, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING 2021 INTERNATIONAL BUILDING CODE(IBC) o sTBae� <br /> DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS. REPORT ALL 2021 INTERNATIONAL RESIDENTIAL CODE IRC ss/oNALCN� <br /> DISCREPANCIES TO THE ENGINEER IMMEDIATELY. 1. FRAMING LUMBER SHALL BE KILN-DRIED (KD) OR SEASON DRIED 2021 WASHINGTON ENERGY CODE FOR COMMERCIAL BUILDINGS,CHAPTER 5 9/3/2025 <br /> 5. DO NOT SCALE DRAWINGS. (SD), MC< 19%AND GRADED AND MARKED IN ACCORDANCE WITH O I S O <br /> THE WEST COAST LUMBER INSPECTION BUREAU (WCLIB) OR THE 202 OF THE IEBC AND THE REPAIR WORK FOLLOWS CODE PROVISIONS <br /> WESTERN WOOD PRODUCTS ASSOCIATION(WWPA) FOR THE REPAIR OF EXISTING BUILDINGS IN CHAPTER 4. <br /> B. CONSTRUCTION PHASING AND SEQUENCING <br /> 1. WORK SEQUENCE AND SCHEDULING SHALL BE COORDINATED WITH THE a. MISC 2X FRAMING MEMBERS:DOUGLAS FIR NO.2 . THE FIRE DAMAGE IS LESS THAN SUBSTANTIAL STRUCTURAL DAMAGE <br /> OWNER'S REPRESENTATIVE AND BUILDING OPERATIONS STAFF. b. EXPOSED TRIM:APPEARANCE GRADE WESTERN RED CEDAR OR AS DEFINED IN SECTION 202 OF THE IEBC. <br /> #2 HEM-FIR, NON-INCISED PRESERVATIVE TREATED PER AWPA <br /> 2. OWNER WILL CONTINUE TO USE BUILDING DURING WORK. CONTRACTOR STANDARD T1,USE CATEGORY UC3B. FOR REPAIR OF DAMAGE THAT IS LESS THAN SUBSTANTIAL <br /> SHALL PHASE AND ARRANGE WORK SO AS TO MAINTAIN ACCESS AND STRUCTURAL DAMAGE,SECTION 405 IF THE IBEC ALLOWS DAMAGED <br /> EGRESS TO ENTRANCES, EXITS, DRIVES, ETC. AT ALL TIMES TO ALL ELEMENTS TO BE RESTORED TO THEIR PREDAMAGED CONDITION. <br /> AREAS THAT ARE NOT UNDER CONSTRUCTION. 2. CARPENTRY HARDWARE: AS PERTAINS TO STRUCTURAL ELEMENTS. <br /> 3. CONTRACTOR SHALL SHORE/BRACE STRUCTURE AS REQUIRED TO <br /> MAINTAIN THE STABILITY OF BUILDING ELEMENTS TO REMAIN DURING b. NAILS:BOX AMERICAN OR CANADIAN MANUFACTURER ONLY. ABBREVIATIONS <br /> REPAIR OF STRUCTURAL ELEMENTS. <br /> APPROX = APPROXIMATELY <br /> 4. CONTRACTOR SHALL MAINTAIN THE BUILDING ENVELOPE IN A 8D COMMON(2.5"X 0.134") 1. Z <br /> WATERTIGHT CONDITION THROUGHOUT THE DURATION OF 10D COMMON(3"X 0.148") 2. BM = BEAM 0 <br /> CONSTRUCTION. ANY WATER RELATED DAMAGE CAUSED BY THE 16D COMMON(3.5"X 0.165") 3. BOT BOTTOM I— <br /> 4. CIP CAST-IN-PLACE CO 0" <br /> CONSTRUCTION SHALL BE REPAIRED AT NO COST TO THE OWNER. - Z <br /> b. ANCHORS AND CONNECTORS:SIMPSON STRONG-TIE. 5. CJ = CONSTRUCTION JOINT/CONTROL JOINT a Z <br /> 5. THE CONTRACTOR SHALL VERIFY WORK HOURS WITH THE OWNER. 6. CLR = CLEARANCE <br /> c. FASTENERS IN CONTACT WITH PRESERVATIVE TREATED LUMBER <br /> co <br /> CONTRACTOR SHALL COORDINATE ANY OFF-HOURS, WEEKEND, AND SHALL BE HOT DIPPED GALVANIZED OR EQUIVALENT. 7. COL = COLUMN Z W j <br /> HOLIDAY WORK WITH OWNER AT LEAST 72 HOURS ADVANCE. 8. CONC = CONCRETE <br /> 9. DET = DETAIL <br /> C. MISCELLANEOUS REQUIREMENTS 3. MINIMUM NAILING:NAIL PER 2021 IRC TABLE 602.3(1) 10. EA = EACH Q L rLnI <br /> 1. THE CONTRACTOR IS RESPONSIBLE FOR COLLECTION AND REMOVAL OF 11. EMBED = EMBEDMENT LENGTH J V <br /> INSULATION 12. EXIST = EXISTING Q <br /> ALL CONSTRUCTION DEBRIS ON A DAILY BASIS,AND THE SITE SHALL BE C. 13. IN = INCHES <br /> LEFT IN A NEAT AND ORDERLY CONDITION, SATISFACTORY TO THE 14. INC = INCIDENTAL MM <br /> OWNER. 1. MATERIAL: 15. LF = LINEAR FOOT W 6 <br /> 2. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL ADJACENT 16. LS = LUMP SUM w <br /> a. ATTIC:FIBERGLASS BATT OR BLOWN INSULATION,R-49 MINIMUM. <br /> STRUCTURES, LANDSCAPING, AND OTHER SURFACES/ITEMS WHICH 17. MAX = MAXIMUM O <br /> COULD BE AFFECTED BY THE WORK. b. 2X4 WALLS:PAPER-FACED BATT INSULATION:R-15 MINIMUM. 18. MIN = MINIMUM N <br /> 3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ANY REQUIRED 19. N/A = NOT APPLICABLE ILL <br /> SECURITY AT THE WORK SITE, SIDEWALK PROTECTION, AND 2. INSTALLATION: INSTALL ACCORDING TO MANUFACTURER'S 20. OC = ON CENTER Q <br /> BARRICADES, AS REQUIRED. ANY SITE RELATED PROTECTION, INSTRUCTIONS AND PROJECT DETAILS. 21. REINF = REINFORCEMENT <br /> 22. REQ'D = REQUIRED - <br /> BARRICADES AND SECURITY SHALL BE COORDINATED WITH THE OWNER. <br /> 23. SF SQUARE FOOT- z Itui 4. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED D.SLIDING GLASS DOORS AND WINDOWS: 24. SIM = SIMILAR Q LU <br /> PERMITS,AND AUTHORIZATIONS PRIOR TO BEGINNING THE WORK. 1. REMOVE AND REPLACE SLIDING GLASS DOORS AND WINDOWS 25. SPEC = SPECIFICATION ^ LU <br /> 5. THE OWNER RESERVES THE RIGHT TO PERFORM OTHER WORK IN IDENTIFIED IN PROJECT DRAWINGS. MATCH EXISTING OPERATION 26. SUPT = SUPPORTED L.L <br /> a CONJUNCTION WITH THE PROJECT. COORDINATE ALL WORK WITH UNLESS NOTED OTHERWISE: 27. TAR = TYPICAL AS REQUIRED LL1 <br /> OTHER CONTRACTORS. 28. TYP TYPICAL <br /> a. U-FACTOR 0.30 MINIMUM. <br /> = <br /> IN29. UN OR UNO= UNLESS NOTED OTHERWISE <br /> b. COLOR:WHITE = z <br /> N 30. WI WORK ITEM >_ O <br /> o C. MATERIAL:VINYL 31. N/A = NOT APPLICABLE <br /> Q 2. INSTALL ACCORDING TO MANUFACTURER'S INSTRUCTIONS. 32. (N) = NEW U <br /> r <br /> 33. (E) = EXISTING w o <br /> 2� 34. NIC = NOT IN CONTRACT a <br /> ° 35. NTS = NOT TO SCALE z c� <br /> o WSEC-0503.3.2.1 REPLACEMENT w w <br /> 0 36. FIN = FINISHED <br /> FENESTRATION PRODUCTS 5 ° <br /> 37. FL FLOOR G O u <br /> Where some or all of an existing fenestration unit is 38. HR - HOUR G_ U <br /> replaced with a new fenestration product,including 39. VIF = VERIFY IN FIELD J <br /> X sash and glazing,the replacement fenestration unit <br /> o shall meet the applicable requirements for U-factor w O <br /> v and SHGC in Table C402.4. LL o w <br /> w r <br /> o <br /> LI EKITCHENCOMPLYING <br /> LATION IN BATHROOMS AND O o <br /> LL <br /> LYING WITH 2O21 IMC(n . PROJECT NO: 39A01607.00 <br /> DRAWN BY: KK <br /> ND HEATING EQUIPMENT SHALLCHECKED BY: TT <br /> ENERGY CODE. SEE C505.4.3. <br /> Y� <br /> SHEET TITLE: <br /> 0 <br /> GENERALNOTES <br /> O <br /> 0 <br /> 0 <br /> 0 <br /> Lu <br /> L City of Everett Permit Services <br /> w EVERETT Reviewed for Permit 05/29/2025 R 001 <br /> Copyright 2025.All rights reserved.No part of this document may be reproduced in any form or by any means without permission from Walker Consultants <br />