My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
March 24, 2026 Scott Pattison <br />Executive Project Manager City of Everett SUBJECT: Phase 1B Work & Fee Proposal – Everett Outdoor Event Center Dear Scott, <br />Please find attached the Phase 1B Work and Fee Proposal f rom Bayley Construction and <br />DLR Group for the further advancement of design of th e Everett Outdoor Event Center, as <br />part of the progressive design-build delivery method. This proposal has been developed based on an anticipated Design Support through August 1st, 2026. The total proposed cost for Phase 1B is $3,880,006.00, excluding Washington State Sales Tax (W.S.S.T.), and includes a 3% design contingency. A detailed <br />cost summary is enclosed for your review. Key Assumptions & Qualifications To maintain the proposed budget and schedule, this <br />proposal is expressly conditioned upon the following assumptions. Should these <br />conditions change, or if the stated dates are not met, Bayley Construction reserves the right to request an equitable adjustment to the contrac t price and schedule: 1. Site Access & Parcel Acquisition: The City of Everett shall complete the purchase <br />of all required parcels and provide the Design-Build team with full, unencumbered <br />access to said parcels in a reasonable time frame. See att ached schedule for key milestones. 2. Stakeholder Agreement Terms: We assume the City will finalize its negotiations <br />with the various project stakeholders in a reasonable ti me frame. 3. Parcel Configuration Continuity: The current design and pricing are based on the <br />existing plan to acquire parcels as planed based on the S D+ Documents. Significant <br />alterations to the acquisition list or site boundary wi ll change the design and require <br />a re-evaluation of fees and design schedule. 4. Utility Value Engineering (Sewer Build-Over): Our pricing assumes that the Value Engineering (VE) strategy to build over the existing sewer is acceptable to all <br />authorities having jurisdiction. Furthermore, this pr oposal assumes that a build- <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.