My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Multipurpose Stadium <br />Bayley+DLR Group Design Cost to GMP ( Phase1B Final Design) <br />Scope Of Work Phase 1B - Final Design Cost Type Comments/Notes <br />Bayley - PreCon Services <br />Bayley Construction PreCon Services Bayley 401,683.00$ NTE <br />DLR - Architectural / Structure / Civil Design <br />Architectural DLR Group 2,278,637.00$ Fixed Fee <br /> - Expenses (Allowance) DLR Group 37,470.00$ Allowance - T&M <br />Structural Design DLR Group -$ Fixed Fee Included w/ Above <br />Civil Design (KPFF) KPFF -$ Fixed Fee Included w/ Above <br />Discount DLR (75,000.00)$ Fixed Fee <br />Mechanical / Electrical / Fire Design <br />Mechanical Design Johansen/Sazan 338,310.00$ Fixed Fee <br />Electrical Design (Coffman) Cochran / Coffman 310,327.00$ Fixed Fee <br />Red Hawk Fire RedHawk 30,606.00$ Fixed Fee <br />Survey / Geotechnical/ Environmental Consultants <br />Survey Harmson 20,000.00$ NTE Allowance for Misc. Survey. <br />Geotechnical GeoEngineers 40,000.00$ NTE <br />Environmental GeoEngineers 178,700.00$ NTE <br />GeoEngineers - Contingency GeoEngineers 20,000.00$ Allowance - T&M Allowance for Misc Support. <br />Hazardous Materials Report & Testing Rich Carlson 90,000.00$ NTE <br />Note Phase 1 costs realocated to other <br />Scopes. <br />Stormwater Treatment Permitting WaterTectonics 32,600.00$ NTE <br />PotHole Allowance TBD 20,000.00$ Allowance - T&M <br />Sub Total: 3,723,333.00$ Contingency / G&L/ B&O/ Fee <br />Design Contingency 3% 111,699.99$ NTE <br />General Liability Insurance 1% 26,299.84$ NTE <br />Cost of Work, Excluding Bayley <br />PreCon. <br />B&O Tax .70% 18,672.89$ NTE <br />Cost of Work, Excluding Bayley <br />PreCon.-$ Total 3,880,006$ <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.