Laserfiche WebLink
Everett Multipurpose Stadium <br />Bayley+DLR Group Design Cost to GMP ( Phase1B Final Design) <br />Scope Of Work Phase 1B - Final Design Cost Type Comments/Notes <br />Bayley - PreCon Services <br />Bayley Construction PreCon Services Bayley 401,683.00$ NTE <br />DLR - Architectural / Structure / Civil Design <br />Architectural DLR Group 2,278,637.00$ Fixed Fee <br /> - Expenses (Allowance) DLR Group 37,470.00$ Allowance - T&M <br />Structural Design DLR Group -$ Fixed Fee Included w/ Above <br />Civil Design (KPFF) KPFF -$ Fixed Fee Included w/ Above <br />Discount DLR (75,000.00)$ Fixed Fee <br />Mechanical / Electrical / Fire Design <br />Mechanical Design Johansen/Sazan 338,310.00$ Fixed Fee <br />Electrical Design (Coffman) Cochran / Coffman 310,327.00$ Fixed Fee <br />Red Hawk Fire RedHawk 30,606.00$ Fixed Fee <br />Survey / Geotechnical/ Environmental Consultants <br />Survey Harmson 20,000.00$ NTE Allowance for Misc. Survey. <br />Geotechnical GeoEngineers 40,000.00$ NTE <br />Environmental GeoEngineers 178,700.00$ NTE <br />GeoEngineers - Contingency GeoEngineers 20,000.00$ Allowance - T&M Allowance for Misc Support. <br />Hazardous Materials Report & Testing Rich Carlson 90,000.00$ NTE <br />Note Phase 1 costs realocated to other <br />Scopes. <br />Stormwater Treatment Permitting WaterTectonics 32,600.00$ NTE <br />PotHole Allowance TBD 20,000.00$ Allowance - T&M <br />Sub Total: 3,723,333.00$ Contingency / G&L/ B&O/ Fee <br />Design Contingency 3% 111,699.99$ NTE <br />General Liability Insurance 1% 26,299.84$ NTE <br />Cost of Work, Excluding Bayley <br />PreCon. <br />B&O Tax .70% 18,672.89$ NTE <br />Cost of Work, Excluding Bayley <br />PreCon.-$ Total 3,880,006$ <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal