My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 23RD AVE W 2025 Plans 2026-05-06
>
Address Records
>
23RD AVE W
>
4918
>
Plans
>
4918 23RD AVE W 2025 Plans 2026-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:31:47 AM
Creation date
5/6/2026 8:29:59 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
4918
Permit
B2503-073
Year
2025
Notes
Rebuilding existing decks making one slightly larger
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: GEOTECHNICAL NOTES: SHEET DESCRIPTION <br /> 1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF APPLICABLE FEDERAL, STATE, 1. SOIL BEARING CAPACITY: DECK PIPE PILES SHALL BE DESIGNED PER GEOTECHNICAL SO1 GENERAL NOTES <br /> AND LOCAL CODES AND OTHER REQUIREMENTS WHICH HAVE BEEN ADOPTED BY THE REPORT BY GEOTECH CONSULTANTS, INC. (DATED 10/20/2021). ALLOWABLE AXIAL <br /> LOCAL JURISDICTION OR ARE OTHERWISE APPLICABLE TO THIS PROJECT. COMPRESSIVE CAPACITIES: <br /> S02 3D DRAWING <br /> 2. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF ALL 2—INCH PIPE PILE: 2 TONS <br /> DIMENSIONS, GRADES, AND OTHER CONDITIONS, AND SHALL CORRELATE AT THE JOB SITE S03 3D DRAWING <br /> ALL SUCH ITEMS. GENERAL CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE 2. PILE INSTALLATION: PIPE PILES SHALL BE DRIVEN TO REFUSAL PER GEOTECHNICAL <br /> ARCHITECT FOR CLARIFICATION AND CORRECTION PRIOR TO BEGINNING ANY WORK. RECOMMENDATIONS (MINIMUM PENETRATION RESISTANCE OF 1 INCH OR LESS PER SO4 3D DRAWING <br /> 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE WORK AND THE MINUTE AS APPLICABLE). <br /> COORDINATION OF ALL TRADES AND GOVERNING AGENCIES AND SHALL PROVIDE ALL 3. PILE MATERIAL SPECIFICATIONS: S05 3D DRAWING <br /> MATERIALS AND LABOR (SHOWN OR INFERRED) ON THESE PLANS TO RENDER THE WORK <br /> COMPLETE. 2—INCH DIAMETER PILES: SCHEDULE 80 STEEL PIPE S06 3D DRAWING <br /> 4. IT SHALL BE THE GENERAL CONTRACTORS RESPONSIBILITY FOR THE SUPERVISION OF THE STANDARD BLACK STEEL PIPE ACCEPTABLE; NO GALVANIZATION REQUIRED. <br /> WORK. 4. PILE CONNECTIONS: PIPE SECTIONS TO BE CONNECTED USING THREADED COUPLERS, S07 3D DRAWING <br /> 5. ALL PLANS SHALL BE IN ACCORDANCE WITH 2O21 IRC & IBC. SNUG SLIP COUPLERS (WITH SHIMS OR WELDING FLUX IF NEEDED), OR BY WELDING. <br /> S08 3D DRAWING <br /> 6. FOUNDATION AND RAILING ARE ENGINEERED AND REST OF DESIGN IS PRESCRIPTIVE. 5. FOUNDATION SUPPORT: EACH ISOLATED DECK FOOTING SHALL BE SUPPORTED BY A <br /> MINIMUM OF THREE PIPE PILES: S09 3D DRAWING <br /> ONE VERTICAL PILE S10 3D DRAWING <br /> TWO DOWNSLOPE BATTERED PILES AT A MINIMUM 1:4 (H:V) INCLINATION AT DIFFERENT <br /> MATERIAL: DIRECTIONS. <br /> S11 EAST ELEVATION <br /> DECKING: TIMBERTECH EDGE COCONUT HUSK 6. SITE CLASS: SEISMIC SITE CLASS D PER IBC 1613 / ASCE 7-16. <br /> RAILING: 6061 ALUMINUM S12 SOUTH ELEVATION <br /> FOOTING CONCRETE: 2,500 PSI S13 EX. UPPER DECK PLAN <br /> REINFORCEMENT STEEL: 40 KSI S14 EX. LOWER DECK PLAN <br /> S15 UPPER DECK PLAN <br /> DESIGN CRITERIA: S16 UPPER DECK FRAMING <br /> DEAD LOAD: 10 PSF <br /> S17 LOWER DECK PLAN <br /> LIVE LOAD: 60 PSF <br /> S18 LOWER DECK FRAMING <br /> SNOW LOAD: 25 PSF <br /> S19 DETAILS-1 <br /> WIND LOAD: 10 PSF <br /> S20 DE7AILS-2 <br /> FRAMING GRADES AND SPECIES: S21 FOUNDATION DETAILS <br /> JOISTS: 2 x 8 PRESSURE TREATED DF No. 2 <br /> S22 CABLE RAILING DETAILS <br /> BEAMS: 6 x 8 PRESSURE TREATED DF No. 2 <br /> 6 x 12 PRESSURE TREATED DF No. 2 <br /> 5.5 x 11.25 GLULAM BEAM 24F—V4 <br /> 5.5 x 14 GLULAM BEAM 24F—V4 <br /> POSTS: 6 x 6 PRESSURE TREATED DF No. 2 <br /> RAILING: <br /> 42" 3BD HORIZONTAL CABLE RAILING <br /> FASCIA MOUNT <br /> 2"X2" POSTS <br /> 3"X1" RAIL TOP <br /> ABBREVIATIONS: <br /> CENTER LINE <br /> O.0 ON CENTER <br /> DIN DOWN <br /> TYP. TYPICAL <br /> CLIENT PAUL & ALISON VIJGEN DATE 08/24/2025 DRAWN BY M. ALMOUTI <br /> 4918 23RD AVE W <br /> ADDRESS EVERETT, WA 98203 SCALE ` City of Everett Permit Services <br /> PARCEL 00644500000600 SHEET 1 APPROVED BY EVERETT Reviewed for Permit 10/07/2025 <br /> WRSHINGTON 3mmNe- <br />
The URL can be used to link to this page
Your browser does not support the video tag.