0 <br />"I <br />MECHANICAL SCOPE OF WORK: <br />2021 WSEC COMPLIANCE <br />N <br />INSTALL (1) ONE NEW TRANSFER FAN (TF-1) TO SERVE MIDDLE ROOM. <br />INSTALL (1) ONE NEW EXHAUST FAN (EF-1) TO SERVE MIDDLE ROOM. <br />1 C403.3.2 - WAG EQUIPMENT SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS OF TABLES C403.3.2(1) THROUGH C403.3.2(16) OF THE WSEC AND AS INDICATED <br />IN THE CONTRACT DOCUMENTS, PLATE -TYPE UOUO-TO-LpUp HEAT EXCHANGERS SHALL MEET THE MINIMUM REQUIREMENTS OF AHRI 400, <br />NEW DUCTWORK TO SERVE MIDDLE ROOM AND TO BE CONNECTED TO EXISTING PROCESSING EQUIPMENT SYSTEM. <br />Cx PROCESS SHALL INCLUDE EQUIPMENT START UP, POINT TO POINT TESTING, TAB, CK AND TRAINING AS REQUIRED <br />2 C403.4.1.2 - WHERE USED TO CONTROL BOTH HEATING AND COOLING, ZONE THERMOSTATIC CONTROLS SHUN PROVIDE A TEMPERATURE RANGE OR DEADBAND of AT <br />REFER TO NOTE 22 ON 2021 WSEC COMPLIANCE NOTES FOR REPORTING REQUIREMENTS. <br />LUST 5-F (28-C) WITHIN WHICH THE SUPPLY OF HEATING AND C000NG ENERGY TO THE ZONE IS CAPABLE OF BEING SHUT OFF OR REDUCED TO A MINIMUM IN <br />ACCORDANCE WITH THIS SECTION OF THE WSEC AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. <br />CONTROL SCOPE OF WORK' <br />TRANSFER FAN (TF-1) OPERATION: <br />3 C403.4.2.2 - AUFMMATC THE CLOCK OR PROGRAMMABLE CONTROLS SHALL BE CAPABLE OF STARTING AND STOPPING THE SYSTEM FOR SEVEN DIFFERENT DAILY <br />SCHEDULES PER WEEK AND RETAINING THEIR PROGRAMMING <br />BAS TO CONTROL FAN OFF/ON AND MONITOR ALL MAJOR COMPONENTS. <br />AND TIME SETTING DURING A LOSS OF POWER FOR AT LEAST 10 HOURS. ADDITIONALLY, THE CONTROLS <br />STALL RAVE A MANUAL OVERRIDE THAT ALLOWS TEMPORARY OPERATION OF THE SYSTEM FOR UP TO 2 HOURS; A MANUALLY OPERATED TWER CAPABLE OF BEING <br />FAN TO OPERATE CONTINOUS 24/7 365-DAYS, <br />ADJUSTED TO OPERATE THE SYSTEM FOR UP TO 2 HOURS; OR AN OCCUPANCY SENSOR IN ACCORDANCE WITH THIS SECTION OF THE WSEC AND DESCRIBED IN THE <br />TEMPERATURE <br />BAS TO ALARM ON EQUIPMENT FAILURE. <br />CONTROL SEQUENCES. <br />EXHAUST FAN (EF-2) OPERATION: <br />WHEN EXISTING PROCESS EQUIPMENT IS OFF (EF-3 OFF), <br />EF-2 SHALL OPERATE TO MAINTAIN SPACE PRESSURE. <br />TF-1 AND EF-1 SHALL BE BALANCED TO MAINTAIN ROOM <br />PRESSURE NEGATIVE, AIRFLOW INWARD. <br />EXHAUST FAN (EF-3) OPERATION: (EXISTING) <br />WHEN EXISTING PROCESS EQUIPMENT IS ON (EF-2 OFF), <br />EF-3 SHALL OPERATE TO MAINTAIN EQUIPMENT <br />VENTILATION REQUIREMENTS. <br />BASIS OF DESIGN: <br />MIDDLE ROOM TO HAVE A MINIMUM OF 5 ACH (PER CLIENT REQUIREMENTS) <br />PROJECT CODE SUMMARY <br />TRADE I CATEGORY <br />BOD CRITERIA INPUT <br />SOURCE I ADDITIONAL SOURCE INFO DATE, MEETING, E-MAIL,ETC <br />CODE BASIS FOR PROJECT <br />MECHANICAL <br />MECHANICAL CODE <br />2021 WASHINGTON MECHANICAL CODE <br />AEM <br />EFFECTIVE MARCH 15TH 2024 <br />MECHANICAL <br />ARE CODE <br />2021 INIERINKRONAL ARE CODE WITH STATE AND LOCAL AMENDMENTS <br />AN <br />EFFECTIVE MARCH 15TH 2024 <br />MECHANICAL <br />PLUMBING CODE <br />2021 UNIFORM PLUMBING CODE WITH STATE AND LOCAL AMMENDMENTS <br />AN <br />EFFECTIVE MARCH 15TH 2024 <br />MECHANICAL <br />ENERGY CODE <br />2021 WASHINGTON STATE ENERGY CODE WITH LOCAL AMMENDMENTS <br />AHI <br />EFFECTIVE MARCH 15M 2024 <br />MECHANICAL <br />BUILDING CODE <br />2021 INTERNATIONAL BUILDING CODE (IBC) <br />Ali <br />EFFECTIVE MARCH 15TH 2024 <br />MECHANICAL <br />ELECTRICAL CODE <br />2023 NATIONAL ELECTRICAL CODE WITH LOX AMENDMENTS <br />AHJ <br />DUCT INSULATION SCHEDULE [5] <br />DUCT TYPE [2] <br />LDCATON <br />CLIMATE ZONE <br />TEMP RANGE <br />(DEGREES F) <br />INSULATION R-VALUE <br />REQUIREMENT <br />INSULATION TYPE [3] <br />TRANSFER AIR [1, 4] <br />WITHIN CONDITIONED SPACE, DOWNSTREAM OF AN ENERGY <br />RECOVERY MEDIA, UPSTREAM OF AN AUTOMATIC SHUTOFF DAMPER <br />4C <br />ALL <br />R-8 <br />FIBERGLASS <br />COMPLIANT WITH 2O21 WA STATE ENERGY CODE AND COMMERCIAL PROVISIONS (WSEC) <br />NOES: <br />1. INSULATION NOT REQUIRED FOR DUCTWORK WITHIN EQUIPMENT. <br />2. INSULATION FOR SHEET METAL PLENUMS SHALL BE THE SAME AS INDICATED FOR DUCTS, REFER TO OUTSIDE AIR, SUPPLY, RETURN, OR EXHAUST FOR SERVICE APPLICATION. <br />3. PROVIDE FSK INSULATION FOR DUCTS AND PLENUMS, EXCEPT PROVIDE FSK INSULATION WITH WEATHERPROOF ALUMINUM JACKET FOR DUCTS OUTSIDE THE BUILDING. <br />4. RETURN MR PLENUMS WITH PERMANENT OPENINGS TO CONDITIONED SPACE ARE CONSIDERED CONDITIONED SPACE <br />5. CODE REFERENCE IS SECTION C403.10.1 WA STATE ENERGY CODE. <br />4 C403.10.1, C403.1D2 - DUCTWORK SHALL BE SEALED AND TESTED TO EXCEED THE REQUIREMENTS OF SECTIONS C403.10.1 AND C403.10.2 OF THE WSEC. REFER <br />TO THE GUCTWORK STATIC PRESSURE AND SEAL CLASS PARAGRAPH BELOW. PER SECTION C403.10.2 OF THE WSEC, DUCTWORK SHALL BE CO EI RUCTED AND ERECTED <br />IN ACCORDANCE WITH THE INTERNATIONAL MECHANICAL CODE. DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION OF GALVANIZED DUCTWORK. <br />o <br />DUCT TAPE IS NOT PERMITTED AS A SEALANT ON ANY DUCTS. <br />rr <br />5 DUCTWORK STATIC PRESSURE AND SEAL CLASS <br />LOW PRESSURE (1/2 - 2 IN WC): <br />SEAL All LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND CONNECTIONS OF SUPPLY AND RETURN DUCTS, <br />MEDIUM PRESSURE (GREATER THAN 2 IN WC - LESS THAN 3 IN WC): <br />SEAL All LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND CONNECTIONS OF SUPPLY AND RETURN DUCTS AND DUCT WALL PENETRATIONS. <br />H <br />HIGH PRESSURE (3 IN WC AND GREATER): <br />SEAL All LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND CONNECTIONS OF SUPPLY AND RETURN DUCTS AND DUCT WALL PENEIRATONS. IN ADDITION, DUCTS <br />d <br />AND PLENUMS SHALL BE LEAK -TESTED IN ACCORDANCE WITH THE SMACNA WAC AIR DUCT LEAKAGE TEST MANUAL WITH THE RATE OF AIR LEAKAGE (CL) LESS THAN <br />d. <br />DR EQUAL TO 4.0 AS DETERMINED IN ACCORDANCE WITH EQUATION 4-12. <br />0 <br />6 C408.2.2, C408.2.2.1, C40B.2.2.2 -PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AND PIPE RUNS TO TERMINAL DEVICES AS REQUIRED BY SECTIONS C40B.22 <br />� <br />(WAC SYSTEMS), C4DB2.2.1 (AIR SYSIEMS), AND C4DB.2,2.2 (HYDRONIC SYSTEMS) OF THE WSEC AND AS INDICATED ON THE CONTACT DDCUMEMS <br />7 C403.10.1 - All DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION C403.10.1 OF THE WSEC AS SHOWN IN TABLE C403.10.1.1 AND TABLE C403.10.1.2, AS <br />SUMMARIZED IN THE DUCT INSULATION SCHEDULE. <br />z aaaaaaa <br />8 C403.10.3 - ALL PIPING SERVING AS PART OF A HEATING OR CODLING SYSTEM SHALL BE THERMALLY INSULATED IN ACCORDANCE WITH TABLE C40T.10.3 OF THE <br />WSEC, AS SUMMARIZED IN THE PLUMBING AND PIPE INSULATION SCHEDULE <br />9 C403.4.2 - FOR ALL OCCUPANCIES OTHER THAN GROUP R, EACH ZONE SHALL BE PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY <br />EITHER AN AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROL SYSTEM IN ACCORDANCE WITH SECTION C403.4.2 OF THE WSEC. <br />10 C403.4.4, C403.6.4 - SUPPLY WATER AND AIR TEMPERATURES SHALL BE AUTOMATICILLY RESET AS REQUIRED IN SECTION C403.4.4 (WATER) OF THE WSEC FOR <br />HYDRONIC SYSTEMS GREATER THAN OR EQUAL TO 300,000 BTUH AND SECTION C403.6.4 (AIR) OF THE WSEC FOR MULTIPLE ZONE WAG SYSTEMS, AND AS DESCRIBED <br />IN THE TEMPERATURE CONTROL SEQUENCES. <br />Z <br />11 C403.5 - AIR ECONOMIZERS SHALL BE PROVIDED ON ALL NEW AIRSIDE COOLING SYSTEMS AND SHALL MEET THE REQUIREMENTS OF SECTIONS C403,5,1 THROUGH <br />C403.5.5 OF THE WSEC. <br />cc Uj <br />12 C403.5.1 - ECONOMIZER SYSTEMS SHALL BE INTEGRATED WITH THE MECHANICAL COOLING SYSTEM AND BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN WHEN <br />G W <br />ADDITIONAL MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER OF THE COOLING LOAD IN ACCORDANCE WITH SECTION C403.5.1 OF THE WSEC. <br />Z <br />13 C403.5.4.1 -WATER ECONOMIZER SYSTEMS SHILL BE CAPABLE OF COOLING SUPPLY AIR BY INDIRECT EVAPORATION AND PROVIDING UP TO 100 PERCENT OF THE <br />cc <br />EXPECTED SYSTEM COOLING LOW AT OUTDOOR AIR TEMPERATURES OF NOT GREATER THAN 50-DEG F OB/45 DG-F WET BULB IN ACCORDANCE WITH SECTION <br />Z <br />C403.5.4.1 OF THE WSEC. <br />ILL I W <br />14 C403.4.1 - SIMULTANEOUS HEATING AND COOLING TO INDI ZONES SHALL BE PROHIBITED AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES EXCEPT <br />co <br />Q Z <br />WHERE PERMITTED IN SECTION C403.4.1 OF THE WSEC. <br />N <br />O N rn <br />15 C4032.4 - FOR FAN AND PUMP MOTORS 5 HP AND GREATER, VARIABLE FREQUENCY DRIVES SHALL BE PROVIDED FOR VARIABLE FLOW HYDRXC AND AIR HANDLING <br />E <br />SYSTEMS AS REQUIRED BY SECTION C403.2.4 OF THE WSEC, UNLESS OTHER CONTROLS AND DEVICES TO LIMIT MOTOR DEMAND AS REQUIRED IN THIS SECTION ARE <br />H_ <br />PROVIDED, AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES <br />3 <br />ZJ <br />15 C404.5 - ELECTRIC WATER HEATERS IN UNCONDITIONED SPACES OR ON CONCRETE FLOORS SHALL QU PLACED ON AN INCOMPRESSIBLE, INSULATED SURFACE WITH A <br />3 <br />5 <br />MINIMUM THERMAL RESISTANCE OF R-10 IN ACCORDANCE WITH SECTOR C404.5 OF THE WSEC. <br />J Z <br />17 C404.7 - CIRCULATING HOT WATER SYSTEM PUMPS SHALL BE CONTROLLED IN ACCORDANCE WITH SECTION C404.7.1 OF THE WSEC. HEAT TRACE TEMPERATURE <br />0 LU <br />W W .o W <br />SYSTEMS SHALL BE CONTROLLED IN ACCORDANCE WITH SECTION C404.7.2 OF THE WSEC. HOT WATER STORAGE SYSTEM PUMPS SHALL BE CONTROLLED IN <br />a` <br />_ <br />ACCORDANCE WITH SECTION C404.7.3 OF THE WSEC. <br />a <br />18 C405.8 - ELECTRIC MOTOR EFFICIENCY SHALL COMPLY WITH SECTION C405.8 OF THE WSEC AND SHALL NOT EE LESS THAN THE CORRESPONDING VALUES FOR <br />ENERGY EFFICIENT MOTORS PROVIDED IN TABLES C405.8(1) THROUGH C405.8(4) WHEN TESTED AND RATED IN ACCORDANCE WITH DOE 10 CAR 431. <br />Z <br />0 <br />19 C103.6.1 - RECORD DOCUMENTS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY SECTION C103.6.1 OF THE WSEC. CONSTRUCTION DOCUMENTS SHALL BE <br />T- <br />Q <br />UPDATED TO CONVEY A RECORD OF THE COMPLETED WORK. SUCH UPDATES SHALL INCLUDE UPDATED MECHANICAL, PLUMBING, AND CONTROL DRAWINGS THAT SHOW <br />Z <br />ALL CHANGES TO SIZE, TYPE AND LOCATIONS OF COMPONENTS, EQUIPMENT AND ASSEMBLIES, <br />U <br />Q <br />20 C1D3.62 - OPERATING AND MUNTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AND INCLUDE THE FOLLOWING PER SECTION C103.6.2 OF THE WSEC. <br />U <br />1. SUBMITTAL <br />Z <br />DATA <br />2. MANUFACTURER'S OPERATION AND MAINTENANCE DATA FOR EQUIPMENT. <br />Q <br />E <br />3, NAME AND ADDRESS OF AT LEAST ONE SERVICE AGENCY. <br />0 <br />c0i <br />4. HYAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION. <br />O <br />5. A NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE, INCLUDING RECOMMENDED SEE POINTS. SEQUENCE OF OPERATION ALONE IS NOT ACCEPTABLE <br />2 <br />FOR THIS REQUIREMENT. <br />21 C40822 - HVAC St5TU45 SHAH BE CHANCED AS REQUIRED BY SECTION C408.2.2 OF THE WSEC, <br />cn <br />Z <br />— <br />22 C408A.3 - A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS 'FINAL COMMISSIONING REPORT' SHALL BE DELIVERED TO THE BUILDING OWNER AS <br />vi <br />IW- <br />REQUIRED BY SECTION C408.1.3 OF THE WSEC AND SHALL INCLUDE: <br />O <br />1. RESULTS OF FUNCTIONAL PERFORMANCE TESTS. <br />Z <br />2. DISPOSITION OF DEFICIENCIES FOUND DURING TESTING, INCLUDING DETAILS OF ODRRECTVE MEASURES USED OR PROPOSED. <br />r <br />3. FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING THE COMMISSIONING PROCESS INCLUDING MEASURABLE CRITERIA FOR TEST ACCEPTANCE, PROVIDED <br />HEREIN FOR REPEATABILITY. <br />Z <br />4. COMMISSIONING PLAN, <br />5. TESTING, ADJUSTING, AND BOUNCING REPORT. <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />Drawn By UMC <br />Checked By RG <br />Lega: <br />Original Issue Date 03/27/2025 <br />THIS DRAWING AND THE DESIGN <br />HEREIN ARE THE PROPERTY OF <br />Job No. 9598 <br />UNIVERSITY MECHANICAL <br />CONTRACTORS, INC. FOR THEIR <br />Scale AS SHOWN <br />USE IN CONSTRUCTION OF THIS <br />PROJECT. NO OTHER USE SHALL <br />Sheet Na. <br />SE PERMITTED WITHOUT THE <br />WRITTEN CONSENT OF UNIVERSITY <br />MECHANICAL CONTRACTORS, INC. <br />I O.O ^ <br />M <br />M0.02 <br />