My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1615 75TH ST SW 2025 EVERETT TECHNICAL PARK Plans 2026-05-06
>
Address Records
>
75TH ST SW
>
1615
>
EVERETT TECHNICAL PARK
>
Plans
>
1615 75TH ST SW 2025 EVERETT TECHNICAL PARK Plans 2026-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 10:33:48 AM
Creation date
5/6/2026 10:33:23 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1615
Tenant Name
EVERETT TECHNICAL PARK
Permit
B2505-027
Year
2025
Notes
TI - BACK TO BACK SHRED IDF ROOM, MAINTAIN EXTG STAFF BREAK
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit 4. 82505-027 <br /> Site Address: E615 75FH SW 200-220 <br /> `VV� Owner: EVERETT TECC H PARKRK I I <br /> EVERETT TECHNICAL PARK 1 Tenant PROVIDENCE HOME HEALTH&HOSPICE <br /> App.Date: 6/7/2025 <br /> AUG 05 2025 Permit Type: COMMERCIALBUILD1. <br /> Subtype: COMMERCIAL ALTERATION(T.I.,INFERIOR <br /> SECOND FLOOR MO,ADDITION,ETC) <br /> CITY OF EVERETT Description: TIE.11TTO BACK SHRED IDF ROOM, <br /> Permit Services MAIM{IPXTgFFBREAKgReviewed By: 11✓Tj 5SUITE 200 HOME HEALTH & HOSPICE o ME! �O _.L Le et <br /> NAY 0 7 2C25 D <br /> EVERETT, WASH/NGTON CITY OF EVERETT APPROVED <br /> Permit Services Hof Community,PlanningDEPARTMENT <br /> coMENTDevelopment <br /> A PLANNING DEPARTMENT <br /> c <br /> CONSTRUCTION DOCUMENTS <br /> ABBREVIATION/SYMBOLS PROJECT TEAM PROJECT INFORMATION DRAWING LIST SCOPE DESCRIPTION V <br /> ACT ACOUSTICAL CEILING TILE LB(S) LAG BOLT(S)IPOUND(S) <br /> ADDL ADDITIONAL MAX MAXIMUM JRJ JOB NO:202512 COVER SHEET <br /> ADJ ADJUSTABISHFLOOR MECH MECHANICAL EVERETT TECHNICAL P W THE WORK CONSISTS OF MINIMAL TENANT IMPROVEMENT WORK WITHIN 13,817 SQ.FT.+I-OF B OCCUPANCY EXISTING <br /> AFF ABOVE FINISH FLOOR MFR MANUFACTURER(LNG) OWNER 161575TH MEET,SW SUITE PREMISES. <br /> ALUM ALUMINUM MH MANHOLE EVERETT,WASHINGTON CODE SUMMARY <br /> APPROX APPROXIMATELY MIN MINIMUM SABEY CORPORATION LS.1 LIFE SAFETY PLAN,EXITING B CODE SUMMARY TENANT IMPROVEMENT SCOPE OF WORK AT SUITES 2008 SUITE 220 CREATING RACK TO BACK SHARED IDF ROOM AND <br /> MISCELLANEOUS ARCH ARCHITECTURAL MISC 1220 TUKWLA INTERNATIONAL BLVD MAINTAIN EXISTING STAFF BREAK ROOM AS SHARED AMENITY BETWEEN TWO ADJACENT SUITES THROUGH A NEW • <br /> AFF ABOVE FINISH FLOOR M 4T <br /> .O. MASONRY OPENING SHARED HALLWAY. <br /> FLOOR <br /> AUTO AUTOMATIC <br /> MTD. MOUNTED SEATTLE,WA 98168 REFERENCED CODES <br /> AN AUDIOVISUAL N NORTH 2O21 INTERNATIONAL BUILDING CODE(IBC) O <br /> BD BOARD NEG NEGATIVE <br /> CONTACT JOE SABEY ARCHITECTURAL <br /> BLDG BUILDING NIC NOT IN CONTRACT � 20211NTERNATIONALMECHANICALSPECIALNCODE(IMC) Additional Permits Are Required <br /> CAB CABINET No. NUMBER (206)281-8700 A1.1 DEMOLITION FLOOR PLAN For This Project To Include: <br /> CB CATCH BASIN NIS NOT TO SCALE lossralsabev.— 2021 UNIFORM PLUMBING CODE(UPC) A1.2 DEMOLITION REFLECTED CEILING PLAN <br /> CCTV CLOSED CIRCUIT TV oc ON CENTER 2023 NATIONAL ELECTRICAL CODEVERETT FIRE DEPT.REVIEW <br /> (NEC)( ) A2.0 OVERALL FLOOR PLAN Plumbing Q Sprinkler <br /> CER CERAMIC OD OUTSIDE DIAMETER(DIM.) A2.1 PARTIALFL00RPLAN PPROVED Mechanical Fire Alarm <br /> 1973 UNIFORM FIRE CODE <br /> CG CORNER GUARD OPN(G) OPENING) PROVIDENCE HEALTH AND SERVICES ❑APPROVED WITH CHANGES NOTED EJ <br /> A3.1 PARTIAL REFLECTED CEILING PLAN <br /> CJ CONTROL JOINTPPP OPPOSITE 2021NFPA101LIFESAFETYCODE ❑REVISE <br /> CTED: RESUBMIT Electrical <br /> Al.NE 7 PARTIAL FINISH PLANBDOORS,FRAMES HARDWARE SCHEDULE ❑REJECTED: <br /> CL CENTER LINE/CLEARANCE PERM PERIMETER BU�DING2,SUITE 190 2021 WASHINGTON STATE ENERGY CODE(WSEC) ❑SEE ATTACHED CHECKLIST/HANDOUT <br /> CLG CEILING PL PtATEIPROPERTY LINE <br /> CUR CLEAR PLAM PLASTIC LAMINATE PORTLAND,OREGON 97213 <br /> CMU CONCRETE MASONRY UNIT PLYWD PLYWOOD CONTACT: MARK SU The issuance of a permit shall not <br /> CO CLEAN OUT PNL PANEL merksurvan@ RYAN prowl om be construed as authority to violate, <br /> COL COLUMN PTD PAINT(ED) (425)3W1394 cancel or set as <br /> any provision of <br /> CONIC CONCRETE PR PAIR,PRINTER the Everett Fire Code or other <br /> CONST CONSTRUCTION PREFAB PREFABRICATE(D) applicable regulations or laws.The <br /> CONT NUEICONTINUGUS PSF POUNDS PER SQUARE FOOT <br /> issuance of a permit based on <br /> CPT CARPET PSI POUNDS PER SQUARE INCH ARCHITECT construction documents and other SUITE200-HOME HEALTH <br /> CSWK CASEWORK PVC POLYVINYL CHLORIDE JRJARCHITECTdata shall not prevent the Fire Code &HOSPICE <br /> CT CERAMIC TILE CORNELL OAKSS <br /> QT QUARRY TILE CORNELL OAKSITHE COMMONS BUILDING Offical from requiring the correction <br /> CTR o CENTER QUAN QIIANTffY PARKWAY,SUITE 280 <br /> f errors. EVERETT TECHNICAL <br /> CU CUBIC R RADIUS BEAVERTON,REGON 970D6 <br /> PARR 1-LEVEL 2 <br /> DBL DOUBLE RAD RADIUS (503)690-1779 FAX:(503)690-0913 + <br /> 1615 75TH ST SW DEG DEGREE(S) RB ROOF DRAINIRC NT BASE IBC BUILDING REQUIREMENTS -_�---- EVERETT WA 98203 <br /> DF DIAMETGFOUMAIN RD ROOF CONTACT: TOM WESEL GCCUPANCYTYPE: B(NO CHANGE IN OCCUPANCY TYPE AS RESULT OF PROJECT) KEY PLAN <br /> DIA DIAMETER RECIR RECIRCULATION TION h narch'ruln CONSTRUCTION TYPE: 1-A <br /> DIAG DIAGONAL RECIRC RECIRCULATION <br /> DIM DIMENSION RECT RECTANGULAR <br /> DIV DMSIONIDMDER REF REFERENCE <br /> DN BUILDING AREA 1 <br /> DOWN REFR REFRIGERATOR -— <br /> EA EACH REINF REINFORCE(D)(ING)(MENT) FIRST FLOOR 48,167 SF OVERALL W <br /> EJ EXPANSION JOINT RED REQUIRE(D) GENERAL CONTRACTOR SECOND FLOOR 48,392 SF OVERALL #I <br /> ELEC ELECTRICAL) RESIL RESILIENT TOTAL AREA 98,559 SF TOTAL <br /> ELEV ELEVATORIELEVATION REV REVISEDIREVISION SUMMIT COMMERCIAL CONSTRUCTION y <br /> EPP EPDXY PAINT RM ROOM <br /> EQ EQUAL RND ROUND EQUIP EQUIPMENT RO ROUGH (425)533-8204 FAX:42 <br /> OPENING ( 5f 877-0112 i <br /> EN EACH WAY ROW RIGHTOFWAY CONTACT: PETER MEYER-PROJECT MANAGER s <br /> EWC ELECTRIC WATER COOLER SC SOLID CORE peterMsummilcdkcom Q W <br /> EXAM EXAMINATIONIEXAMINING SCHED SCHEDULE C! <br /> SECTION C4 <br /> E10 <br /> EXIST EXISTING R SF XI EXTERIOR SQUARE FOOT Oar H J INN; Z z <br /> FD FLOOR DRAIN SHT SHEET a N NO a V <br /> FDC FIRE DEPARTMENT CONNECTION SPEC SPECIFICATIONS N Q <br /> PECIFIED } :� _ O 0 <br /> FDNT FOUNDATION ST STREETISTREAM MECHANICAL(DELEGATED DESIGN) ] �,et IW Z 0 <br /> FE FIRE EXTINGUISHER SS STAINLESSSTEEL 171.'ft t� M• <br /> FEC FIRE EXTINGUISHER CABINET BID STANDARD Z <br /> A �LU W LU Q 10 FHC FIRE HOSE CABINET STL STEEL <br /> FIN FINISHED) STRUC STRUCTURAL +`' r r, R 8 LUINN 0 R V <br /> FLR FLOORING) SV TELSHEEPHONE <br /> �i.�r r. z' <br /> FLUOR FLUORESCENT TEL TELEPHONE _ <br /> INN <br /> FT FOOTIFEET TEMP TEMPERATUREREMPORARY <br /> FIG FOOTING T&G TONGUEBGROOVE 1 1 y '� _ IIIJ W GA GALVANIZ D THK THICKNESS) ' ?•• ' O y <br /> GAIN GALVANIZED THRU THROUGH ELECTRICAL(DELEGATED DESIGN) I ' _ _, S_ �, •ftaJ ; N ; Z GB GYPSUM BOARD TOS TOP OF STEEL <br /> GRIND GROUNDLASSfG�INGIGLAZED TTYYP TYPICALON W W C1 <br /> GYP GYPSUM UL UNDERWRITERS LAB. <br /> V <br /> HB HOSE BIBB LIND UNLESS OTHERWISE NOTED _ y <br /> (HT) HEIGHT VCT VINYL COMPOSITION TILE <br /> HM HOLLOW METAL VENT VENTILATIONNENRLATE <br /> HR HOUR VERT VERTICAL <br /> HTR HEATER W WITH PLUMBING(DELEGATED DESIGN) <br /> ID INSIDEDIAPAETER(DINT.) We WHITE BOARDM'OODBASE DEFERRED SUBMITTALS <br /> IN INCH WC WATERCLOSET <br /> INCAND INCANDESCENT WD WOOD <br /> INSUL INSULATE(D)(ING) WIG WITHOUT NORTH <br /> LAM LAMINATE Wi WEIGHT VICINITY MAP 9227 <br /> IAV LAVATORY FIRE ALARM(DELEGATED DESIGN) REGISTERED <br /> ARCHITECT SYMBOLS FIRE SPRINKLER(DELEGATED DESIGN) A_ <br /> GRAVEL I AcOUSTICAL <br /> Thomas A.Wesel <br /> CEILING PANEL 1 STATE OF WASHINGTON <br /> EARTH(FILL) ® CERAMIC TILE - .,..0 Tores,Park0 Le,veliPar, O <br /> QUARRYTILE <br /> ® PAVING <br /> ASPHAUT ® FINISHED WOOD E EwATEnEARLIN <br /> crux ' rxk Esr v.xx <br /> CONCRETE, rnrae rany rerm,nal:O s sEA c <br /> Revisions: <br /> n METAL POURED ® INSULATOR, <br /> ❑glp <br /> RIDGt <br /> BRICK NSUhkvE. rsox x� rxrs cre vi <br /> ® ® LATION, a swrrs o m <br /> muklneo <br /> p«v L s <br /> ® PLYWOOD ® INSULATION danar�ese - Mm '"If <br /> .,, RIGID "� <br /> 'E GYPSUM WOOD con aervariun <br /> ® BOARD ® CONTINUOUS .rea Reroeck m EwE rAxx xEv <br /> nery 0 <br /> PLASTER,MORTAR BLOC <br /> sadu <br /> BLOCKING OR SHIM <br /> Subway <br /> DIRECTION VIEWED EYE <br /> 1 xssEEu EXTERIOR ELEVATION Auer vu <br /> c2 A4.1 SHEET WHERE ELEVATION IS DRAWN -�- FLOOR LEVEL LINE rans se <br /> DIRECTION VIEWED O SHEET NOTE xpNNER. �l.seeing rCt',re:cJdU9 g, iuu.nr�c�vbx® E. <br /> >$ <br /> �g <br /> 4 xr"sc <br /> BUILDING$ECTIONIDENTIFICATION O EQUIPMENT NOTES $ KaErh Park wesrrna i oQ <br /> A4.2 SHEET WHERE SECTION IS DRAWN ��b & NTExcrn cnscxoE viEw 3 O`om <br /> �A WNDOWTYPE ®9ercrla9aeNa NP mm <br /> 6i I-a tt-P I F1 Id.._ <br /> 1 WALL SECTION IDENTIFICATION Pa R <br /> ��///A��� Paine D'Id O gym <br /> A5.1 SHEET WHERE SECTION IS DRAWN V WALL TYPE(SEE romnsrsw 3 n <br /> �/ PARTITION LEGEND) NOTICE OF EXTENDED PAYMENT PROVISION r <br /> ks The agreement Will allow the Owner to make payment within thirty-five(35)days after the date an <br /> DIRECTIRVIEWED Q xa.-Yr .wiNc Exa <br /> 1 REVISION NUMBER Application for Payment is received by the Owner. ®Plying xema9e k e m <br /> 1 INTERIOR ELEVATION comma,Armor Museum V <br /> A7.1 SHEET WHERE ELEVATION IS DRAWN NOTICE OF ALTERNATE BILLING CYCLE PUBLIC WORK APPROVEDDEPARTMENTm s <br /> 104 ROOWSPACE NUMBER <br /> The Agreement will allow the Owner to require the submission of AppliGaton for Payment in o <br /> DOORSWINGAND billing cycles other than 30-day cycles.The period covered by each Application for Payment will By <br /> 11 DETAIL IDENTIFICATION //emsI�II� DOOR NUMBER be one calendar month ending on the last day of the month.Applications for Payment for the DATE 2 NORTH CITY OF EVERETT <br /> A9.1 SHEET WHERE IDENTIFICATION IS DRAWN I oil (SEE DOOR SCHEDULE) Agreementwill be submitted tothe Owner no laterthan the 5th day ofeach month. CITY OF EVERETT REVIEWED FRPERMIT REVIEWED FOR PERMIT <br /> _ IIII <br /> E , , <br /> architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.