Laserfiche WebLink
City of Everett Permit Services <br /> EVERE T Reviewed for Permit 08/22/2025 <br /> PROJECT SUMMARY M <br /> 0 <br /> �r THE PROJECT INCLUDES REPLACING EXISTING 00 <br /> ATTACHED REAR DECK WITH STAIRS. 0 <br /> _ �;- REPLACE EXISTING PORCH WITH STAIRS o Q <br /> < <br /> 10' X 15' - 150 SQ.FT.Sill U <br /> 5 X 7 35 SQ.FT. <br /> 2 w w <br /> PROJECT INFORMATION o <br /> o � <br /> . . � Qa <br /> OWNER: w W <br /> -- HOOVER WENDY/HOOVER CORY z o O , <br /> PROJECT ADDRESS: O 2 a Irn <br /> 325 79TH PL SW, EVERETT, WA 98203 <br /> 0 <br /> +� c <br /> E �n • a <br /> GENERAL NOTES <br /> cao �n <br /> r• CODE COMPLIANCE N M q*� � � a)ALL WORK SHALL COMPLY WITH THE INTERNATIONAL RESIDENTIAL CODE (IRG), INTERNATIONAL BUILDING CODE • DECK ATTACHMENT SUPPORT 0 0 a <br /> (IBC), WASHINGTON STATE BUILDING CODE (WSBC), AND ALL APPLICABLE LOCAL REGULATIONS. ALL STRUCTURAL CONNECTIONS SHALL BE INSTALLED PER APPLICABLE CODES AND MANUFACTURER WHERE CONFLICTS ARISE B 0 0 0 0ETWEEN CODES, THE MOST STRINGENT REQUIREMENT SHALL APPLY. GUIDELINES. d d <br /> THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK MEETS OR EXCEEDS THE MINIMUM LEGAL THE CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER ANCHORING OF STRUCTURAL COMPONENTS USING <br /> REQUIREMENTS. APPROVED FASTENERS AND BRACKETS. <br /> IF CONDITIONS ARISE THAT REQUIRE MODIFICATIONS, THE CONTRACTOR MUST OBTAIN WRITTEN APPROVAL <br /> • SITE INSPECTION f VERIFICATION BEFORE MAKING CHANCES. <br /> THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND SITE CONDITIONS PRIOR TO CONSTRUCTION. <br /> ANY DISCREPANCIES, UNFORESEEN CONDITIONS, OR CONFLICTS BETWEEN PLANS AND ACTUAL SITE CONDITIONS CONTRACTOR DISCRETION I JUSTIFICATION <br /> MUST BE REPORTED BEFORE PROCEEDING. THE CONTRACTOR MAY MAKE FIELD ADJUSTMENTS AND MODIFICATIONS, PROVIDED THEY: <br /> THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING AND UNDERSTANDING ALL PROJECT DOCUMENTS AND SITE COMPLY WITH ALL APPLICABLE CODES, REGULATIONS, AND INDUSTRY STANDARDS. <br /> CONDITIONS. DO NOT COMPROMISE STRUCTURAL INTEGRITY OR PROJECT INTENT. <br /> ARE JUSTIFIABLE BASED ON SITE CONDITIONS OR PRACTICAL CONSIDERATIONS. <br /> • WORKMANSHIP f STANDARDS IF REQUESTED, THE CONTRACTOR MUST PROVIDE JUSTIFICATION FOR ANY DEVIATIONS FROM THE DRAWINGS. <br /> ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER, CONSISTENT WITH INDUSTRY STANDARDS AND ANY MAJOR DEVIATIONS OR MODIFICATIONS MUST BE DOCUMENTED AND REPORTED TO THE OWNER OR <br /> BEST PRACTICES. ARCHITECT. <br /> THE CONTRACTOR SHALL ENSURE THAT ALL MATERIALS USED MEET OR EXCEED APPLICABLE CODES AND <br /> MANUFACTURER RECOMMENDATIONS. INSPECTION I APPROVAL <br /> ANY PROPOSED SUBSTITUTIONS OR DEVIATIONS MUST BE APPROVED IN WRITING BEFORE IMPLEMENTATION. THE CONTRACTOR SHALL SCHEDULE AND PASS ALL REQUIRED INSPECTIONS BEFORE COVERING ANY WORK OR <br /> PROCEEDING TO THE NEXT PHASE OF CONSTRUCTION. <br /> • STRUCTURAL REQUIREMENTS THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH INSPECTORS TO ENSURE COMPLIANCE WITH ALL <br /> ALL STRUCTURAL COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH PRESCRIPTIVE SPAN TABLES OR APPLICABLE CODES. 12 DECKS & FENCES <br /> AN APPROVED ENGINEERED DESIGN. ANY MODIFICATIONS REQUIRED BY INSPECTORS SHALL BE COMPLETED IN ACCORDANCE WITH THEIR DIRECTION <br /> FOOTINGS SHALL BE SIZED AND INSTALLED PER LOCAL DEPTH AND LOAD REQUIREMENTS. AT THE CONTRACTOR'S EXPENSE. 12decks.and.fences@gmail.com <br /> DECK FRAMING SHALL BE CONSTRUCTED USING APPROVED MATERIALS SUITABLE FOR OUTDOOR USE, SUCH AS <br /> PRESSURE-TREATED WOOD OR CERTIFIED STEEL (OR OTHER) FRAMING SYSTEMS. SITE CLEANUP I SAFETY <br /> ALL FASTENERS, CONNECTORS, AND HARDWARE SHALL BE CORROSION-RESISTANT AND COMPATIBLE WITH THE THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A GLEAN AND SAFE JOB SITE AT ALL TIMES. designed by IP ,DESIGN <br /> MATERIALS USED. ALL WASTE MATERIALS SHALL BE DISPOSED OF IN COMPLIANCE WITH LOCAL REGULATIONS. ilia@ipdesign.group <br /> THE CONTRACTOR SHALL IMPLEMENT NECESSARY SAFETY MEASURES TO PROTECT WORKERS, PROPERTY, AND <br /> THE PUBLIC DURING CONSTRUCTION. Page 1/4 <br />