My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Corrosion Engineering 5/14/2026 Amendment 4
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Northwest Corrosion Engineering 5/14/2026 Amendment 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2026 2:40:56 PM
Creation date
5/15/2026 2:40:41 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corrosion Engineering
Approval Date
5/14/2026
Council Approval Date
5/13/2026
End Date
12/31/2026
Department
Public Works
Department Project Manager
Brian Doolan
Subject / Project Title
On-Call Service for Cathodic Protection and Coating Evaluation
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Tracking Number
0001691
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> AMENDMENT NO. 4 PROFESSIONAL SERVICES AGREEMENT <br />This Amendment to Professional Services Agreement (“Amendment”) is effective as of <br />the date of last signature below, and is between the City of Everett, a Washington municipal <br />corporation (the “City”), and the Service Provider identified below (“Service Provider”). The City <br />and Service Provider are parties to the Professional Services Agreement described below, as may <br />have been previously amended ("Agreement"). In consideration of the covenants, terms and <br />conditions set forth below, and for good and valuable consideration, the receipt and sufficiency <br />of which are hereby acknowledged, the City and Service Provider agree to amend the Agreement <br />as set forth below: <br />Service Provider Northwest Corrosion Engineering <br />City Project Manager <br />Brian Doolan <br />bdoolan@everettwa.gov <br />Original <br />Agreement Date <br /> <br />3/26/2019 <br /> <br />AMENDMENTS <br />New Completion Date <br />If this Amendment changes the Completion Date, enter the new Completion Date: 12/31/2026 If no new date is entered, this Amendment does not change the Completion Date. <br />New Maximum Compensation Amount <br />If this Amendment changes compensation, complete the following table. If the table is not completed, this Amendment does not change compensation. <br />Maximum Compensation Amount Prior to this Amendment Enter amount, if applicable <br />Compensation Added (or Subtracted) by this Amendment Enter amount, if applicable <br />Maximum Compensation Amount After this Amendment Enter amount, if applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.