My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 15 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br /> <br /> <br /> <br />00 7200 - 15 GENERAL CONDITIONS <br />used by the Contractor or delivered to any of the Contractor’s officers, clerks or employees or posted at <br />the site of the Work or mailed to any post office addressed to the Contractor at the address given in the <br />Contract Documents or mailed to the Contractor's last known place of business. If mailed, any form of <br />communication will be deemed to have been given to and received by the Contractor the day after the day <br />of mailing. <br />4.5.2. Suggestions to Contractor <br />Nothing in these Contract Documents requires the Owner’s Representative to provide the Contractor with <br />direction or advice on how to do the Work, construction practices, or means and methods. If the Owner’s <br />Representative approves, suggests or recommends any construction practice, means, method or manner <br />for doing the Work or producing materials, the approval or recommendation shall not: (A) guarantee that <br />following the method or manner will result in compliance with the Contract Documents; (B) relieve the <br />Contractor of any risks or obligations under the Contract Documents; or (C) create any liability by the <br />Owner to the Contractor. <br />Suggestions as to the plans or methods of accomplishing the Work or Contract requirements by the <br />Owner or the Owner’s Representative to the Contractor but not specified or required, if adopted or <br />followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the <br />Contractor. The Owner and the Owner’s Representative assume no responsibility therefor and in no way <br />will be held liable for any defects in the Work which may result from or be caused by use of such plan or <br />method or Work. <br />4.5.3 Meetings with Owner <br />The Contractor shall have its duly authorized representative attend periodic informational meetings with <br />the Owner’s Representative and City staff, as reasonably required by the Owner. <br />Contractor, Owner, and Owner’s Representative shall meet as often as determined by the Owner’s <br />Representative, but no less often than once each month. The purpose of the meeting is to review Project <br />status in relation to the construction schedule; review value of Work completed during the previous <br />month; and, if applicable, review Contractor's plans to return Project status to that required by the <br />schedule. If requested by the Owner or Owner’s Representative, the Contractor shall submit a written <br />progress report within five (5) days following this meeting, comprising: <br />1. The current construction schedule indicating percent complete, actual completion or start dates <br />since the previous review, the estimated remaining duration for each activity in progress, <br />Schedule of Values update, and narrative summary. <br />2. Reasons any activities are behind schedule and the corrective steps being taken. <br /> 4.5.4. Cooperation with Others <br />The Contractor agrees to permit entry to the Site of the Work by the Owner, its employees or other <br />contractors performing work on behalf of the Owner. The Contractor shall afford to the Owner, other <br />contractors and their employees, reasonable facilities and cooperation and shall arrange its work and <br />dispose of its materials in such a manner as to not interfere with the activities of the Owner or of others <br />upon the Site of Work. The Contractor shall promptly make good any Contractor-caused injury or <br />damage to persons or property that may be sustained by other contractors or employees of the Owner. <br />The Contractor shall join its work to that of others and perform its work in proper sequence in relation to <br />that of others. <br />If requested by the Contractor, the Owner will arrange meetings with other contractors performing work <br />on behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself <br />of the planned activities of other contractors and will coordinate its work with the other contractors. <br />Contractor shall notify the Owner of problems, interference or any difficulty with other contractors or <br />workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the
The URL can be used to link to this page
Your browser does not support the video tag.