City of Everett 00 7200 - 32 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br /> <br /> <br /> <br />00 7200 - 32 GENERAL CONDITIONS <br />acceptance of the Schedule of Values by the Owner’s Representative, it shall be used as a basis for all <br />requests for payment. <br />9.1.2. Progress Payments <br />9.1.2.1 Payment Request Procedures: <br />By the tenth day of each month, or by schedule mutually agreed upon in writing by the Contractor and <br />Owner’s Representative, the Contractor shall submit to the Owner’s Representative a partial payment <br />estimate filled out and signed by the Contractor covering acceptable Work performed during the previous <br />month, or since the last partial payment estimate was submitted. Contractor’s submission of a progress <br />pay estimate constitutes a material representation by the Contractor that it performed all of the Work <br />described in the progress pay estimate during the relevant time period in a workmanlike manner and that <br />the materials for which payment is requested reasonably conform to the Specifications and are either on <br />the job Site or have been installed. If requested by the Owner’s Representative, the Contractor shall <br />provide such additional data as may be reasonably required to support the payment estimate. Such data <br />may include satisfactory evidence of payment for Equipment, materials and labor including payments to <br />Subcontractors and Suppliers. Certified invoices by the Suppliers shall accompany a request for payment <br />for delivered Equipment and material. Such Equipment and material shall be suitably and safely stored at <br />the Site of the Work. Payment requests shall summarize accepted operating and maintenance material <br />with request for Equipment payment. A progress payment is preliminary only. By making a progress <br />payment, the Owner does not waive or release its right, nor is it estopped from asserting, that previous <br />progress payments were not earned or were in error, whether in whole or in part. <br />9.1.2.2 Review Procedures: <br />The Owner’s Representative will review the estimate and either indicate in writing to the Owner his or <br />her concurrence with the estimate and his or her recommendation that payment be made, or indicate in <br />writing to the Contractor his or her reasons for not concurring with the estimate. If the Owner’s <br />Representative recommends payment and the Owner concurs, the Owner will pay the Contractor a <br />progress payment on the basis of the approved partial payment estimate, less retainage and any amounts <br />the Owner may withhold pursuant to Contract or law. The recommendation of the Owner’s <br />Representative is not conclusive, final or binding upon the Owner. <br />In the event the Owner’s Representative does not concur with the estimate, the Contractor may make the <br />changes necessary to obtain the Owner’s Representative's concurrence and resubmit the partial payment <br />estimate, or submit the original progress payment estimate directly to the Owner, indicating in writing its <br />reasons for refusing to make the changes necessary to obtain concurrence. <br />9.1.2.3 Retained Percentage <br />As provided in 9.7. Retainage, the Owner will retain five percent (5%) of all progress payments. <br />9.1.2.4 Withholding <br />The Owner’s Representative may refuse to recommend the whole or any part of any payment if in the <br />Owner’s Representative's opinion it would be incorrect to make such recommendation to the Owner. The <br />Owner’s Representative may also refuse to recommend any such payment, or because of subsequently <br />discovered evidence or the result of tests, may nullify any such payment previously recommended to such <br />extent as may be necessary in the Owner’s Representative's opinion to protect the Owner from loss as a <br />result of: <br />1. Defective or damaged Work. <br />2. A deductive Change Order. <br />3. Persistent failure of the Contractor to perform the Work in accordance with the Contract <br />Documents, including failure to maintain the progress of the Work in accordance with the <br />construction schedule. Persistent failure to maintain the progress of the Work shall mean that for