My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 2213 - 3 <br />2026 Biosolids Removal and Disposal UT 3752-30 <br />01 2213 - 3 UNIT PRICE MEASUREMENT <br />b.Payment for labor, equipment, tools, and materials necessary for <br />loading, moving, weighing, transporting, and depositing the material <br />in the designated area on the City’s Biosolids Pad shall also be <br />incidental to the payment for each Dry Ton. <br />c.Contractor shall provide a composite sample from each truckload <br />hauled across the scale. Individual truck samples taken will be <br />combined by the City on a daily basis to form a daily composite <br />sample, which will be tested to determine the average percent solids <br />for the day. This average percentage shall be applied to the daily <br />total truck weights for payment. The average percent solids amount <br />from the composite sample must be a minimum of 28%. See Section <br />01 4523 for full sampling requirements. <br />d.The City reserves the right to test individual truck samples for <br />percent solids and apply this percentage to the individual truck <br />weight for payment. <br />e.Contractor is responsible for submitting empty truck scale tickets, full <br />truck scale tickets, and sample data for each truckload the next <br />business day after they have been collected. <br />f.Owner reserves the right to reject applications for payment if: <br />1)Submittal of scale tickets and sample data are not submitted in <br />a timely manner. <br />2)Total Solids of any mass of biosolids fails to meet the minimum <br />specifications. <br />D.Item #4 – DRY TONS BIOSOLIDS TRANSPORTED AND DISPOSED OF AT <br />AN APPROVED SITE (Unit Price) <br />1.For the purposes of this Contract, the Contractor shall be paid the unit <br />price bid for Dry Tons per the amount (by weight) of solids material that is <br />weighted and transported from the designated location on the City’s <br />Biosolids Pad to an approved disposal site. <br />2.For this contract, the measurement of a Dry Ton includes the weight of <br />only solid material contained in each ton of material that crosses the City <br />owned scale – the weight of the water will not be included. <br />3.Contractor shall weight each truck prior to and after picking up solids on <br />the Pad, using the certified scale provided by Owner. <br />4.The calculation of a Dry Ton for payment shall be as per the following <br />equation and examples:
The URL can be used to link to this page
Your browser does not support the video tag.