Laserfiche WebLink
City of Everett 01 2600 - 1 <br />2026 Biosolids Removal and Disposal UT 3752-30 <br />01 2600 - 1 CONTRACT MODIFICATION PROCEDURES <br />SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES <br />1.1 SUMMARY OF MODIFICATIONS PROCEDURES <br />A.Changes to the Work may be required due to field conditions, requests made by <br />the Owner, clarifications to the bid documents, or other needs that result in a <br />change in the cost of the work and/or change in the number of contract days per <br />00 7200 General Conditions, Article 6. The changes to the work will be tracked <br />individually as Request for Change Proposals (RFCP). Request for Change <br />Proposals may either be prepared as a Field Directive, or as a request for pricing <br />prior to proceeding with the work. <br />B.A change order will be issued for one or more RFCP’s grouped into a single <br />change order. Payment for changed work cannot be paid until the change order <br />is finalized and approved as outlined per 00 7200 General Conditions, Article 6. <br />C.The Request for Change Proposal shall clearly identify all labor, material, <br />equipment, and incidentals, including subcontractor’s and supplier’s invoices or <br />quotes as well as Contractor’s timecards. A reference from the latest approved <br />schedule shall be attached justifying any time extension request. Mark ups for <br />all overhead, profit, bond cost, B & O taxes, and insurance shall be added per 00 <br />7200. The form included at the end of this section will be used for directing the <br />work to be done in one of the two manners described below. <br />D.Contractor, and Subcontractors where required, shall provide a breakdown of <br />labor costs including basic wage rates, fringe benefits, FICA, FUTA and SUCA <br />add-ons, per 00 7200 General Conditions. Where premium time is involved, the <br />Contractor shall provide a breakdown of costs in the same detail. <br />1.2 FIELD DIRECTIVE MODIFICATION PROPOSALS <br />A.Changed conditions and/or unanticipated circumstances may require immediate <br />revisions to Work which are essential and from which a delay would result in a <br />time and or cost penalty to the project. When such a condition exists, the Owner <br />shall issue a written Field Directive to the Contractor. <br />B.The Owner will provide direction for the Contractor identifying the necessary <br />changes to be made. The Field Directive shall be identified with a Request for <br />Change number. The Contractor will provide pricing per 1.1 of this section within <br />15 days of the completion of the work.