Laserfiche WebLink
City of Everett 00 2113 - 10 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br /> <br /> <br /> <br />00 2113 - 10 INSTRUCTIONS TO BIDDERS <br />b. If the Bid Form includes unit prices, any of the Bidder’s unit prices are <br />excessively unbalanced (either above or below the amount of a reasonable <br />Bid) to the potential detriment of the City, as determined by the City; <br />c. Receipt of Addenda is not acknowledged; <br />d. A member of a joint venture or partnership and the joint venture or partnership <br />submit Proposals for the same project (in such an instance, both Bids may be <br />rejected); or <br />e. If Bid Form entries are not made in ink. <br />1-02.14 Disqualification of Bidders <br />A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br />bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br />The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br />RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br />documentation as needed from the Bidder and third parties concerning the Bidder’s <br />compliance with the mandatory bidder responsibility criteria. <br />If the City determines the Bidder does not meet the mandatory bidder responsibility <br />criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br />notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees <br />with this determination, it may appeal the determination within two business days of the <br />City’s determination by presenting its appeal and any additional information to the City. <br />The City will consider the appeal and any additional information before issuing its final <br />determination. If the final determination affirms that the Bidder is not responsible, the <br />City will not execute a contract with any other Bidder until at least two business days <br />after the Bidder determined to be not responsible has received the City’s final <br />determination. <br />A Bidder will be deemed not responsible if the Bidder does not meet supplemental <br />responsibility criteria, all as set forth herein and in SECTION 00 2213, SUPPLEMENTAL <br />INSTRUCTIONS TO BIDDERS. <br /> <br />1-02.15 Pre-Award Information <br />Before awarding any contract, the City may require one or more of these items or actions <br />of the apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of any or <br />all materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of and <br />time required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the <br />Engineer, <br />6. Obtain, and furnish a copy of, a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor’s Registration, or