My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 4 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br /> <br /> <br /> <br />00 7200 - 4 GENERAL CONDITIONS <br />Owner's Representative: The person designated in writing and employed or retained by the Owner to <br />act as its representative at the construction Site and to perform construction inspection service and <br />administrative functions relating to this Contract. The terms “Owner’s Representative”, “Engineer” and <br />“Architect” are interchangeable. <br />Person: Includes individuals, associations, firms, companies, corporations, partnerships, and joint <br />ventures. <br />Physical Completion: Physical Completion Date is the day all of the Work is physically completed on <br />the Project. All documentation required by the Contract and required by law does not necessarily need to <br />be furnished by the Contractor by this date. <br />Progress Schedule: A schedule prepared and maintained by Contractor, describing the sequence and <br />duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract <br />Time. <br />Project: The undertaking to be performed under the provisions of the Contract. <br />Punch List: List of incomplete items of Work and of items of Work that are not in conformance with the <br />Contract Documents, prepared after Substantial Completion. <br />Reference Information: Information provided to the Contractor by the City that is not part of the <br />Contract. <br />RCW: Means the Revised Code of Washington. <br />Samples: Physical examples of materials, Equipment, or workmanship that are representative of some <br />portion of the Work and which establish the standards by which such portion of the Work will be judged. <br />Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. Schedule of <br />Values. <br />Shall: Required conduct. <br />Shop Drawings: All drawings, diagrams, illustrations, schedules, and other data or information, which <br />are specifically prepared or assembled by or for Contractor and submitted by Contractor, to illustrate <br />some portion of the Work. <br />Shown: Refers to information presented on the Drawings, with or without reference to the Drawings. <br />Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the <br />Work is to be performed, including rights-of-way and easements for access thereto, and such other lands <br />furnished by Owner that are designated for the use of Contractor. <br />Specifications: That part of the Contract Documents consisting of written descriptions of the technical <br />features of materials, Equipment, construction systems, standards, and workmanship. <br />Specify: Refers to information described, shown, noted or presented in any manner in any part of the <br />Contract Documents. <br />Subcontractor: An individual or entity having a direct contract with Contractor or with any other <br />Subcontractor for the performance of a part of the Work. <br />Submittals: The information required by the Contract Documents provided by Contractor to the <br />Owner’s Representative or Owner. <br />Substantial Completion: The day on which the Owner or Owner’s Representative determines the <br />Owner has full and unrestricted use and benefit of the Project, from both the operational and safety <br />standpoints and only minor incidental Work, replacement of temporary substitute facilities, or minor <br />correction or repair Work remains. Determination of Substantial Completion in whole or in part is solely <br />at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the
The URL can be used to link to this page
Your browser does not support the video tag.