My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 7 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br /> <br /> <br /> <br />00 7200 - 7 GENERAL CONDITIONS <br />manufacturers. The Contractor is responsible for all Work shown or described, regardless of location(s) <br />in the Contract Documents. <br />2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br />2.3.1. Errors and Omissions <br />If the Contractor, in the course of the Work, becomes aware of any errors or omissions in the Contract <br />Documents or in the Owner's field work, he or she shall immediately inform the Owner’s Representative <br />in writing. The Owner’s Representative will promptly review the matter and if he or she finds an error or <br />omission has been made, then he or she will determine the corrective actions and advise the Contractor <br />accordingly. If the corrective work associated with an error or omission significantly increases or <br />decreases the amount of Work called for in the Contract, the Owner will issue an appropriate Change <br />Order. After discovery by the Contractor of an error or omission, related work performed by the <br />Contractor shall be done at its risk unless authorized by the Owner’s Representative and approved by the <br />Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br />manifestly necessary to carry out the intent of the Drawings and Specifications, or that are customarily <br />performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the <br />Work, but they shall be performed as if fully and correctly set forth and described in the Drawings and <br />Specifications. <br />2.3.2. Conflicting Provisions <br />Figure dimensions on drawings shall govern over scale dimensions and detail drawings shall govern over <br />general drawings. In the event an item of Work is described differently in two or more locations on the <br />Drawings and in the Specifications, the Contractor shall, upon request of the Owner’s Representative, <br />submit in writing to the Owner’s Representative the description upon which the Contractor relied in <br />preparing its Bid or laying out the Work. If the Owner’s Representative directs the Contractor to perform <br />Work in a manner other than that contemplated by the Contractor in preparing its Bid or laying out the <br />Work, Change Order procedures will be followed. In this event, the Contractor shall submit to the <br />Owner’s Representative such supporting information, including bidding or layout documents, as may <br />reasonably be necessary for the Owner’s Representative to determine whether the Contract Sum is <br />increased, decreased or unchanged by the Change Order. <br />2.3.3. Utilities <br />2.3.3.1 General <br />The Owner has endeavored to determine the existence of utilities at the Site of the Work from the records <br />of the owners of known utilities in the vicinity of the Work. The positions of these utilities as derived <br />from such records are shown on the Drawings. No excavations were made to verify the locations shown <br />for underground utilities. The service connections to these utilities are not shown on the Drawings. It <br />shall be the responsibility of the Contractor to determine the exact location of utilities and service <br />connections thereto. Such field verification must be performed in sufficient time so as not to impede the <br />progress of the Work or fabrication of materials to be incorporated into the Work. The Contractor shall <br />call the Utility Location Request Center (one call center) for location of utilities in the field not less than <br />two (2) nor more than (10) ten business days before the scheduled date of commencement of excavation. <br />The Contractor shall make its own investigations, including exploratory excavations, to determine the <br />locations and type of existing utilities, including service connections, prior to commencing work that <br />could result in damage to such utilities. The Contractor shall immediately notify the Owner’s <br />Representative as to any utility discovered by him in a different position than shown on the Drawings or <br />which is not shown on the Drawings. No excavation shall begin until all known facilities in the <br />excavation areas have been marked. Contractor shall coordinate its activities with the utility provider. <br />Contractor shall bear the cost of maintaining utility service.
The URL can be used to link to this page
Your browser does not support the video tag.