Laserfiche WebLink
<br />Exhibit A <br /> <br />EMC 14.16.713 Rates and Charges <br /> <br />Effective February 1, 2025, the monthly water rates and charges, monthly base charges, monthly filtration <br />charges, and provisions relating to rates and charges throughout the water system shall be as follows: <br /> <br />A. Within City Limits <br /> <br />1. Residential Water Rates and Charges <br /> <br /> <br />Residential Monthly Water Rates and <br />Charges <br /> <br />2025 <br /> <br />2026 <br /> <br />2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />1/2-3/4" Meter Size <br />Base Water Charge $27.15 $28.50 $29.64 $30.83 <br />Charge Added to Base Water Charge per <br />CCF of Metered Water Consumption in <br />Excess of 5 CCF <br /> <br />$5.43 <br /> <br />$5.70 <br /> <br />$5.93 <br /> <br />$6.17 <br />Base Filtration Charge $5.06 $5.47 $5.63 $5.80 <br />Charge Added to Base Filtration Charge per <br />CCF of Metered Water Consumption in <br />Excess of 5 CCF <br /> <br />$1.012 <br /> <br />$1.093 <br /> <br />$1.126 <br /> <br />$1.160 <br />1" Meter Size <br />Base Water Charge $54.29 $57.00 $59.28 $61.65 <br />Charge Added to Base Water Charge per <br />CCF of Metered Water Consumption in <br />Excess of 10 CCF <br /> <br />$5.43 <br /> <br />$5.70 <br /> <br />$5.93 <br /> <br />$6.17 <br />Base Filtration Charge $10.12 $10.93 $11.26 $11.60 <br />Charge Added to Base Filtration Charge per <br />CCF of Metered Water Consumption in <br />Excess of 10 CCF <br /> <br />$1.012 <br /> <br />$1.093 <br /> <br />$1.126 <br /> <br />$1.160 <br />2" Meter Size <br />Base Water Charge $65.15 $68.40 $71.14 $73.98 <br />Charge Added to Base Water Charge per <br />CCF of Metered Water Consumption in <br />Excess of 12 CCF <br /> <br />$5.43 <br /> <br />$5.70 <br /> <br />$5.93 <br /> <br />$6.17 <br />Base Filtration Charge $12.14 $13.12 $13.51 $13.92 <br />Charge Added to Base Filtration Charge per <br />CCF of Metered Water Consumption in <br />Excess of 12 CCF <br /> <br />$1.012 <br /> <br />$1.093 <br /> <br />$1.126 <br /> <br />$1.160 <br />Over 2" Meter Size <br />Base Water Charge $86.86 $91.20 $94.85 $98.64