Laserfiche WebLink
<br />Exhibit A <br /> <br />2" Meter Size <br />Base Water Charge $74.63 $78.35 $81.48 $84.74 <br />Charge Added to Base Water Charge per <br />CCF of Metered Water Consumption in <br />Excess of 12 CCF <br /> <br />In accordance with rate table below <br />Base Filtration Charge $12.14 $13.12 $13.51 $13.94 <br />Charge Added to Base Filtration Charge per <br />CCF of Metered Water Consumption in <br />Excess of 12 CCF <br /> <br />$1.012 <br /> <br />$1.093 <br /> <br />$1.126 <br /> <br />$1.160 <br />Over 2" Meter Size <br />Base Water Charge $99.50 $104.46 $108.64 $112.99 <br />Charge Added to Base Water Charge per <br />CCF of Metered Water Consumption in <br />Excess of 16 CCF <br /> <br />In accordance with rate table below <br />Base Filtration Charge $16.19 $17.49 $18.02 $18.56 <br />Charge Added to Base Filtration Charge per <br />CCF of Metered Water Consumption in <br />Excess of 16 CCF <br /> <br />$1.012 <br /> <br />$1.093 <br /> <br />$1.126 <br /> <br />$1.160 <br /> <br /> <br />Irrigation Rate Table <br /> <br />2025 <br /> <br />2026 <br /> <br />2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />Consumption between 6-30 CCF, per CCF $6.219 $6.529 $6.790 $7.062 <br />Consumption over 31 CCF, per CCF $3.935 $4.132 $4.297 $4.469 <br /> <br />4. City-Installed Service Connection Charges <br /> <br /> <br />City Installed Service Connection Charges <br /> <br />2025 <br /> <br />2026 <br /> <br />2027 <br />2028 and thereafter <br />until superseded by a <br />new rate ordinance <br />5/8 x 3/4" (each) $3,975.00 $4,234.00 $4,510.00 $4,804.00 <br />1" (each) $4,508.00 $4,802.00 $5,115.00 $5,448.00 <br />2" (each) $5,865.00 $6,247.00 $6,654.00 $7,087.00 <br />Added non-refundable application fee $150.00 $158.00 $166.00 $175.00 <br /> <br />Service connection installations larger than the two-inch size shall be charged at the actual cost of the complete <br />installation. <br /> <br />Service connection applications shall be valid only for 180 days from date of issuance unless work is in progress, or <br />a time extension is granted by the Public Works Director. Service connection charges (less the non-refundable <br />application fee) may be refunded to the applicant in the event that the service has not been installed and the <br />refund is requested within one year from the date of issuance. <br />