Laserfiche WebLink
6 <br /> <br />Charge Added to Base Water Charge <br />per CCF of Metered Water <br />Consumption in Excess of 12 CCF <br /> <br />In accordance with rate table below <br />Base Filtration Charge $12.14 $13.12 $16.60 $17.28 $18.00 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 12 CCF <br /> <br />$1.012 $1.093 $1.383 $1.439 $1.499 <br />Over 2” Meter Size <br />Base Water Charge $99.50 $104.46 $111.77 $116.24 $120.89 <br />Charge Added to Base Water Charge <br />per CCF of Metered Water <br />Consumption in Excess of 16 CCF <br /> <br />In accordance with rate table below <br />Base Filtration Charge $16.19 $17.49 $22.14 $23.03 $23.99 <br />Charge Added to Base Filtration <br />Charge per CCF of Metered Water <br />Consumption in Excess of 16 CCF <br /> <br />$1.012 $1.093 $1.383 $1.439 $1.499 <br /> <br />Irrigation Rate Table 2025 2026, Jan- <br />July <br />2026, Aug- <br />Dec 2027 <br />2028 and <br />thereafter until <br />superseded by a <br />new rate <br />ordinance <br />Consumption 6-30 CCF, per CCF $6.219 $6.529 $6.986 $7.265 $7.556 <br />Consumption over 31 CCF, per CCF $3.935 $4.132 $4.421 $4.598 $4.782 <br /> <br />4. City-Installed Service Connection Charges <br /> <br />City Installed Service Connection <br />Charges 2025 2026, Jan- <br />July <br />2026, Aug- <br />Dec 2027 <br />2028 and <br />thereafter until <br />superseded by <br />a new rate <br />ordinance <br />5/8 x 3/4" (each) $3,975.00 $4,234.00 $4,531.00 $4,713.00 $4,902.00 <br />1" (each) $4,508.00 $4,802.00 $5,139.00 $5,345.00 $5,559.00 <br />2" (each) $5,865.00 $6,247.00 $6,685.00 $6,953.00 $7,232.00 <br />Added non-refundable application <br />fee <br /> <br />$150.00 $158.00 $170.00 $177.00 $185.00 <br /> <br />Service connection installations larger than the two-inch size shall be charged at the actual cost of the complete <br />installation. <br /> <br />Service connection applications shall be valid only for 180 days from date of issuance unless work is in progress, <br />or a time extension is granted by the Public Works Director or designee. Service connection charges (less the non- <br />refundable application fee) may be refunded to the applicant in the event that the service has not been installed <br />and the refund is requested within one year from the date of issuance.