Laserfiche WebLink
Description Previous Rate Updated Rate <br />Standard Rate 80%90% <br />Overtime Rate 80%90% <br />Description Previous Rate Updated Rate <br />Mobilization Rate - Per job, insludes <br />planning, one way travel, and <br />workstie preparation and set up $135.00 $148.50 <br />Description Previous Rate Updated Rate <br />Materials 40%45% <br />Appendix A <br />Markup % added to the actual <br />and current prevailing wage <br />hourly rate for all associated <br />trades* <br />Category 1: Required Personnel <br />Category 2: Mobilization <br />Markup % added to the actual <br />Category 3: Materials <br />Markup % <br /># Category 1: Public Information