My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Strider Construction Co., Inc. 5/28/2026 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Strider Construction Co., Inc. 5/28/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 2:01:21 PM
Creation date
5/28/2026 2:01:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Strider Construction Co., Inc.
Approval Date
5/28/2026
Council Approval Date
5/14/2025
End Date
1/24/2027
Department
Parks & Community Services
Department Project Manager
Katherine Phillips
Subject / Project Title
Later Phase Eclipse Mill
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004831
Total Compensation
$199,963.73
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Strider Construction Company, Inc. 5/20/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 63 - 73 <br />Eclipse Mill Riverfront - Construction Package WO# 2100441 <br />00 63 63 - 73 CHANGE ORDER - AGREED <br />Change Order No._________________________ <br />Change Order Effective Date:________________ <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2.The amount of this Change Order for the changes described in Exhibit A, <br />represents complete compensation for the changes described in Exhibit A, <br />including all direct and indirect costs and impacts. The Contract Sum shall be <br />adjusted as described in this Change Order. <br />3.Everett Municipal Code 3.80.050 sets forth the threshold amounts below whichthe Mayor or his designee is authorized to direct Contractor to performadditional work. In calculating such threshold amounts, Washington State salestax, if applicable to the Work, has been considered. <br />4. The Contract Time of the Contract shall be adjusted to the extent described inthis Change Order. <br />5.Contractor waives and releases any and all claims arising out of, or related to,this Change Order, the work described in Exhibit A, and all work and actual orconstructive changes that occurred or began prior to the date of this ChangeOrder, including, but not limited to, claims for equitable adjustment of time andcompensation, delay, impact, overhead, or inefficiencies. This provision doesnot apply to requests for equitable adjustment of time or price for which theContractor timely and properly provided notice of a differing site condition,protest, dispute, claim or Contract Claim as required by the ContractDocuments. If the Contract Documents establish a time period for notice of adiffering site condition, protest, dispute, claim, or Contract Claim that ends afterthe date of this Change Order, but relates to work performed prior to the date ofthis Change Order, then this provision does not apply if the Contractor timelyand properly submits such notice <br />6.This Change Order only changes the contract between Contractor and City tothe extent explicitly provided herein. <br />7.Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br />means, in which case such signature(s) will have the same effect as an original <br />ink signature. This Change Order may be signed in counterparts, each of <br />which shall be deemed an original, and all of which, taken together, shall be <br />deemed one and the same document. <br />01 <br />upon Mayor's signature
The URL can be used to link to this page
Your browser does not support the video tag.