Laserfiche WebLink
• <br /> • <br /> Section 2: The work of changing the elevation of said bridge <br /> shall be done according to plans and specifications to be approved <br /> by the city engineer. <br /> Section 3: That the work of changing the elevation of said <br /> bridge, and all work in connection therewith, shall be completed <br /> within sixty (60) days from the taking effect of <;this ordinance. <br /> Section 4: WHPJ AS , public necessity and convenience requires <br /> that the elevation of said bridge be changed at once, an emergency <br /> is declared to exist, and this ordinance shall take effect upon <br /> its passage and publication. 0 <br /> z -- <br /> Mayor. <br /> NOV <br /> Passed 26 1 <br /> 912 <br /> Attest <br /> k. <br /> Published <br /> 28t ry, <br />