My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4185-26
>
Ordinances
>
Ordinance 4185-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 8:48:30 AM
Creation date
6/12/2026 8:48:16 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4185-26
Date
6/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br />ORDINANCE NO. 4185-26 <br /> <br />AN ORDINANCE creating a special improvement project entitled “Rotary Park Floating Dock Repairs,” <br />Fund 354, Program 112, to accumulate all costs for the project. <br /> <br />WHEREAS, <br /> <br />A. The City Council recognizes the need to maintain and improve City amenities. <br /> <br />B. The City Council recognizes the value and need to provide Everett residents and visitors <br />opportunities for active and boating recreational facilities. <br /> <br />C. The City recognizes that the repairs and installation to a section of floating dock located at Rotary <br />Park is required to ensure safety and continued use is available to the public. <br />NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br />Section 1. A special improvement project fund is hereby entitled Rotary Park Floating Dock <br />Repairs, Fund 354, Program 112. <br /> <br />Section 2. Authorization is hereby granted to the Parks and Facilities Department Director under <br />the administration of the Mayor, to assume full responsibility for conducting all tasks and performing all <br />necessary steps to accomplish the actions authorized by this Ordinance. <br /> <br />Section 3. The estimated cost for the repairs of the floating dock is $100,000. <br /> <br />Section 4. The sum of $100,000 is hereby appropriated to Fund 354, Program 112, Rotary Park <br />Floating Dock Repairs. <br /> <br />A. Use of Funds <br />Construction $100,000 <br />Total $100,000 <br /> <br />B. Source of Funds <br />CIP 3 $100,000 <br />Total $100,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.