Laserfiche WebLink
# <br />Date:18-May-26 <br />EXHIBIT B <br />HOURS FOR EACH TASK (Whole Hours Only) <br />Task 1 Task 2 Task 3 Task 4 Task 5 Cost <br />Project <br />Management Design Bid Assistance <br />Engineering <br />Services During <br />Construction <br />Additional Services <br />as Requested by <br />the Owner <br />1 Project Manager (T. Giese)98.00$ 61 85 17 46 209 20,482$ <br />2 QC Reviewer (C. Ochiltree)106.00$ 8 0 0 0 8 848$ <br />3 Project Engineer (S. Krishnamurthy)61.00$ 0 173 10 48 231 14,061$ <br />4 Structural Engineer (N. Jacoby)76.50$ 0 52 4 12 68 5,202$ <br />5 CADD Lead (T. Muench)62.00$ 0 15 0 4 19 1,178$ <br />6 CADD Tech (A. Bradley)49.00$ 0 160 0 26 186 9,114$ <br />7 Project Assistant (K. McElwain)43.00$ 0 0 0 2 2 86$ <br />8 Sr. Project Assistant (S. Fritchman)58.00$ 0 10 0 0 10 566$ <br />9 Project Administrator (P. Coughlin)48.00$ 14 29 0 0 43 2,076$ <br />- -$ <br />Total Task Hours 83 524 31 138 0 776 <br />Subtotal Direct Salary Cost (DSC), $7,498 33,570 2,582 9,962 0 53,612$ <br />Overhead on DSC (Indirect cost) @, %161.18%12,085 54,108 4,162 16,057 0 86,412$ <br />Total Labor Cost, $19,583 87,678 6,744 26,019 0 140,024$ <br />Task 1 Task 2 Task 3 Task 4 Task 5 <br />Project <br />Management Design Bid Assistance <br />Engineering <br />Services During <br />Construction <br />Additional Services <br />as Requested by <br />the Owner <br />1 197 197 197 10,000 10,591$ <br />2 -$ <br />3 -$ <br />4 Per Labor Hr. Tech. Charge 0 0 0 0 0 -$ <br />Total Expenses, $0 197 197 197 10,000 10,591$ <br />TOTAL LABOR AND EXPENSES 19,583 87,875 6,941 26,216 10,000 150,615$ <br />Task 1 Task 2 Task 3 Task 4 Task 5 <br />Project <br />Management Design Bid Assistance <br />Engineering <br />Services During <br />Construction <br />Additional Services <br />as Requested by <br />the Owner <br />1 $0 <br />2 $0 <br />3 $0 <br />4 $0 <br />TOTAL SUBCONSULTANTS 0 0 0 0 0 $0 <br />Subconsultant Admin Mark-up, %5.00%0 0 0 0 0 $0 <br />Subtotal Cost by Task 19,583 87,875 6,941 26,216 10,000 150,615$ <br />Fee/Profit (as % of Total DSC & Overhead)12.00%2,350 10,521 809 3,122 0 16,802$ <br />Next Year's Labor Escalation*4.00%290 1,296 100 385 0 2,071$ <br />Task 1 Task 2 Task 3 Task 4 Task 5 <br />Project <br />Management Design Bid Assistance <br />Engineering <br />Services During <br />Construction <br />Additional Services <br />as Requested by <br />the Owner <br />22,223 99,692 7,850 29,723 10,000 169,488$ <br />* Next year's labor escalation was calculated assuming 33.00%of the work would be completed next year. <br />Enter data in yellow & green shaded cells only. Other formula cells are locked to prevent accidental changes. There is no password protection. <br />Overall Project Multiplier 2.93 <br />Fee/Profit as a % of DSC Only 31.34% <br />CITY OF EVERETT - WPCF GATE REPLACEMENT AND LAUNDER REPAIR <br />PROJECT HOURS, EXPENSES AND FEE ESTIMATE <br />TOTAL ESTIMATED COST AND FEE, $ <br />Labor Category <br />Direct Salary <br />Hourly Rates, <br />($$.CC) <br />Expenses, $ <br />Subconsultant Expenses, $ <br />Total <br />Sub Expenses <br />Expenses <br />Total <br />Hours <br />Reimbursable Expenses <br />Communication Charge (3% of labor) <br />Expense <br />Subconsultant (ADS Utility Locates) <br />Subconsultant (Surveyor) <br />Subconsultant (Mechanical - HVAC) <br />Subconsultant (Permitting) <br />\\ci.everett.wa.us\HomeDir\Public Works\1Common\PLANT & FAC ENGR\Projects\Maintenance\WPCF\DS1 and SC3 Repair Project\PSA\Everett WPCF Gate Replacement and Launder Repair - Budget - 052026V 2.0 <br /># Category 2: For official use only / disclosure permissible by law.11/20/2014