Laserfiche WebLink
............... <br /> ':?;;tiff•:;;.•?:{.fr: <br /> .:.iR'��:iy,+.;.?::i:::�i''{::�:::•i:i:i:::'ii:�4<'::j:•`:'h{xA"k`L. <br /> •:6.::>; :.. .PIT `• .�► .. .. <br /> Facility Needs (2000- 2005) <br /> Projected student capacity in permanent facilities for each year of the forecast period (2000-2005) <br /> is shown on Table 7. Projected capacity is calculated by subtracting projected FTE enrollment <br /> from existing capacity as modified by planned changes in the educational program and proposed <br /> construction projects. The amount of projected enrollment above or below projected capacity <br /> (after changes) is also shown on Table 7 for each year. <br /> Planned Improvements (2000-2005) <br /> The following is a brief outline of those projects likely needed to accommodate unhoused students <br /> in the Everett School District through the Year 2005 based on OSPI enrollment projections. <br /> Modernization projects are not included. The Everett School District has not yet determined the <br /> scope and timing of a future bond issue. <br /> Elementary Schools <br /> In order to accommodate the 540 unhoused elementary students projected in 2005, it will be <br /> necessary to construct 23 new elementary school classrooms. These will be constructed as <br /> additions to existing elementary schools. In addition, a number of parking lot expansions and <br /> property acquisitions are necessary to provide adequate facilities for the enrollment increases. <br /> Portables will be relocated to provide sufficient teaching space while avoiding additional <br /> construction expense. The total cost, including construction and acquisitions, is estimated to be <br /> $10.86 million. <br /> Middle Schools <br /> Because student enrollment growth is slowing down in the Everett School District, there is no <br /> identified permanent additions needed at the Middle School level. Portable relocations will be <br /> used to absorb student deficiencies, at an anticipated cost of$125,000. <br /> High Schools <br /> 14 additional high school classrooms will be necessary to house the projected 318 unhoused high <br /> school students. Portable relocations will be used to distribute classroom space where it is needed <br /> to maintain the districts Educational Program Standards. Total costs for these additions is $4.64 <br /> million. <br /> Support Facilities <br /> Non-capacity improvements include seismic, telecommunication, utility, roofing and athletic field <br /> upgrades, modernization's and a new Maintenance Facility. <br /> Site Acquisition and Improvements <br /> The District anticipates the needs to acquire one new elementary school site to meet long range <br /> forecasts for enrollment growth. <br /> Everett School District Section 6 - 1 Capital Facilities Plan <br />