Laserfiche WebLink
PIPELINE #2 & #3 REPLACEMENT PH 5/6 <br /> Description: Replace sections of Water Transmission Pipelines Nos. 2 & 3. <br /> The replacement program is part of a pipe rehabilitation program for these <br /> transmission lines that started in 1989. <br /> Location: The next replacement project (Phase 5) is for two pipeline sections— <br /> about 500 feet immediately east of the Snohomish River, and about 800 feet <br /> immediately east of Ebey Slough. Phase 6 is planned to replace pipes on Ebey <br /> Island, the section east of the Phase 5 work to Dead Water Slough. <br /> Justification: (Need/Demand) Water Transmission Lines Nos. 2 and 3 are both <br /> steel pipe and were originally constructed over 65 years ago. The City has been <br /> replacing the pipe in sections since 1989. Phase 5 is for the pipe sections buried <br /> in the most corrosive soils. The'pipe sections must be replaced, as the current <br /> sections are beyond the expected service life, and pipe evaluations indicate <br /> sections are highly corroded and are at risk. The replacement schedule is based <br /> on a pipeline evaluation performed in 1989, that will be updated. Pipeline No. 2 <br /> replacement is expected to be completed when all the pipe is replaced. The <br /> replacement schedule and cost is dependent on obtaining permits. <br /> Amounts in$1,000 <br /> n ,F l f t r ., ;":,i7- �d e=rg _�1, -r <br /> Land&ri t-cI y -�-- - $0 <br /> pang,&Engineering $200 $400 $600 $500 $500 $600 $2,800 <br /> Construction $1,500 $3,000 $2,000 $3,000 $4,500 $1.000 $15,000 <br /> oa,er $0 <br /> $0 <br /> Tonal $1,700 $3,400 $2,600 $3,500 $5,000 $1,600 $17,800 <br /> General Fund $0 <br /> Mtigafion Fees $0 <br /> Assessments $0 <br /> Grants $0 <br /> Rates $200 $400 $600 $500 $500 $600 $2,800 <br /> Other(WIRF) $1,500 $3,000 $2,000 $3,000 $4,500 $1,000 $15,000 <br /> $3 <br /> Trial $1,700 $3,400 $2,600 $3,500 $5,000 $1,600 $17,800 <br /> C:rrEMMCAP-FAC2001.dOc(YJ 3119101) 3 0 <br />