My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2529-01
>
Ordinances
>
Ordinance 2529-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 1:41:19 PM
Creation date
4/7/2014 1:41:08 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2529-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
42 D 1 Langus Langus Park Tray extension,new roads&parking, X X X $106.0 $1,260.0 $1,360.0 $500.0 $2,716.0 <br /> Riverfront &Trait dm <br /> per Snash River Ped bridge and nature <br /> Park Master Plan area Costs reflect Park share d <br /> furxirg forpinl protect w/PubWks <br /> 11 D 1 Legion Golf Legion Golf Cart Storage Bldg Improvements, X $1420 $50.0 $1926 <br /> Course Course Telecomin Improvements,Chem Sto <br /> Improvement Fac,Mari Area Improvements <br /> s per Master <br /> Plan <br /> 12 D 1 Other,Sites Athletic Develop a Regional Youth Athletic Field X X X X $4,166.0 $1,100.0 $600.0 $6,266.0 <br /> as Available Fields Devel Complex Features include Youth <br /> baseball,softball,and soccer fields, <br /> s pportmg facilities,arcuiabon and <br /> 43 D 1 Other,South Develop Develop a minimum 8 acre parcel for a X X X X X X X $10,060.0 $10,060.0 <br /> _ South Area South Everett Aquatic Center This could <br /> Aquatic be in conhunction with a Community <br /> 29 D 1 Other,South Develop Development d a South Everett X X X X $3,000.0 $3,000.0 <br /> South Area Community Center Main features <br /> Recreation/ include gymnasium meeting rooms& <br /> Comm Ctr conference center, classrooms and <br /> supporting facilities <br /> 13 D 1 Rotary Park Rotary Park- IAC Grant match was insufficient to fund X X X $244.0 k526,0 $770.0 <br /> Phase II,Supl total scope of master plan work Items to <br /> Funding complete are Parking Lot Paving, <br /> Restrooms,picnic amenities and wet <br /> land mtgabon The wetland area at site <br /> has been cited on the DOE Hazardous <br /> site List <br /> 14 D 1 Silver Lake Silver Lake Ped&bike trails,erosion control&public X X X 1126.0 $290.0 $400.0 $611.0 <br /> Shoreline Public access <br /> (SR527) Access <br /> Inrprovments <br /> per Master <br /> Plan <br /> w 31 D 1 Sn ohansh Snohomish Paved Trail,Landscape,Imgabon, X X X X X $35.0 $173.0 $55.0 <br /> $263.0 <br /> River Trait River Trail Benches&Tables,RR Xings, <br /> per Master Restrooms,Nursery Devel,Trail Head <br /> Plan&DOE Parking <br /> A9ml <br /> (French Crk <br /> . &Lowell <br /> Rnverfront <br /> Trail <br /> Sections) <br /> 32 D 1 Forest Park Lower Forest Provide a pedestrian rail road crossing X X X X $25.0 $00.0 $1,950.0 12.066.0 <br /> Park at Lower Forest Park at the BNSF line to <br /> RaiRoad allow safe and accessible routes from <br /> • Crossing lard locked Lower Forest Park to the salt <br /> water beech,tidelands,and connection <br /> , to the Port of Everett South Terminal <br /> Trail Complex This protect requires <br /> supplemental faxing from Grams and <br /> the Port of Everett <br />
The URL can be used to link to this page
Your browser does not support the video tag.