My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2529-01
>
Ordinances
>
Ordinance 2529-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 1:41:19 PM
Creation date
4/7/2014 1:41:08 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2529-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. CAPITAL FACILITIES NEEDS <br /> Projected available student capacity was der:.,u by subtracting projected FTE student enrollment <br /> from existing school capacity (excluding relocatable classrooms) for each of the six years in the <br /> forecast period (2000-2005). Capacity needs are expressed in terms of"unhoused students." The <br /> method used to define future capacity needs assumes no new construction. For this reason <br /> planned construction projects are not included at this point. This factor is added later. By the <br /> end of the six-year forecast period (2005), additional classroom capacity will be needed as <br /> follows: <br /> Table 9 - Unhoused Students in 2005 <br /> Grade Span Unhoused Students <br /> Elementary(K-5) 751 <br /> Middle School(6-8) 146 <br /> High School(9-12) 1,567 <br /> Total(K-12) 2,464 <br /> These figures do not include any planned improvements by the District through 2005. These <br /> figures are equivalent to approximately 1.16 elementary schools, 0.20 middle schools and one <br /> high school. <br /> Projected future capacity needs are depicted in Table 10. They are derived by applying the <br /> projected number of students to the projected capacity. Planned improvements by the District <br /> through 2005 are included. It is not the District's policy to include relocatable classrooms when <br /> determining future capital facility needs; therefore interim capacity provided by relocatable <br /> classrooms is not included. (Information on relocatable classrooms and interim capacity can be <br /> found in Table 4. Information on planned construction projects can be found in Section 7.) <br /> - 15 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.