My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2529-01
>
Ordinances
>
Ordinance 2529-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 1:41:19 PM
Creation date
4/7/2014 1:41:08 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2529-01
Date
8/22/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 D 2 T.ASuiliven TA Sullivan Stabilize beach and shoreline,Improve X X X X X $50.0 $420.0 $280.0 $1,006.0 $1,786.0 <br /> Park Beach Parking Lot, Design and Construct <br /> Stabilization waterfront support facility at Silver Lake <br /> and Facility features to Include launching <br /> Waterfront dockwatercraft storage,fishing doc, <br /> Spt Facilities swimming ming dock,classroom,dock <br /> per Master storage,restroom,and outside decking <br /> Plan <br /> 34 D 2 Other, Trail The Non-Motonzed Transportation Plan X X X X $15.0 $286.0 $286.0 $606.0 <br /> Multiple Development has identified recreational trail <br /> Sites development potential and potential <br /> funding sources.Potential regional <br /> projects are -Interurban Trail;- <br /> Harborfront Trail,-Snohomish River <br /> Trail(Link to the Centennial Trail),and <br /> Cross-Liking Trails _ <br /> 40 D 2 T A Sullivan Silver Lake This Phase would consist of immediate X X X $255.0 $330.0 $585.0 <br /> Park Property work to make the new area available for <br /> (Phase 2, recreation programs.Anticipated <br /> Initial improvements to the shoreline,site <br /> Refurbistme dean-up,turf repairs,picnic areas, <br /> nt) parking and circulation could be included <br /> as part of this work This effort should . <br /> focus on"heavy maintenance and <br /> repair of existing infrastructure and <br /> facilities. <br /> 82 D 2 T A.Sullivan Silver Lake 'Phase 3 work is undefined A compete X X f X X X r $20.0 r $2,875.0 $2,650.0 $6,415,0 <br /> Park Property revisit of the T A Sullivan Master Plan <br /> (Phase 3, will be required to define the full scope of <br /> Complete work. Items that could be included are a <br /> Development Community Center,new swimming and <br /> boating facilities,picnic areas,and <br /> playgrounds <br /> 57 D 2 T A Sullivan South Area Work will include construction of skate X $35.0 $275.0 $310.0 ' <br /> 1 Park Skate Park fp facility similar to the at WE Hall Park with <br /> T A Sullivan all necessary landscaping and park <br /> Park amenities around the facility <br /> 72 D 2 Other, Upgrade Upgrade Telecormxnications systems X X X $10.0 $255.0 r $285.0 <br /> Multiple Telecortrmur at Legion,Kasai,T A Sullivan,and <br /> Parks cations at W.E.Had Parks based on facility <br /> Multiple improvements from each Park Master <br /> Parks Plan Improvements to include new <br /> switchgear,new and/or upgraded lines, <br /> T-1 voice and data line service,and intra <br /> Park connection by fiber and copper <br /> lines as required _ _ <br /> 84 D 3 Forest Park Forest Park Develop Forest Management Plan, X X X $100.0 $100.0 $100.0 $300.0 <br /> Reforestation implement tree planting program to . <br /> assure tree survival and maturation in <br /> Forest Park <br /> 67 D 3 Jetty Island Jetty Island Access improvements,nature area, X 2736.0 ' $735.0 <br /> per Master interpretive Area,erosion control <br /> Plan Costs reflect Park share of funding for <br /> joint Project w/Port of Everett. _ <br /> 95 0 3 Other Develop Acquire space,design and construct X X $2,675.0 22,875.0 <br /> Public indoor horticultural/floreultural center <br /> (indoor) in Central Everett area. Concept to <br /> Conservatory provide an all wea0her garden area w/ <br /> and Gardens small meeting and event areas. <br /> , i <br />
The URL can be used to link to this page
Your browser does not support the video tag.