My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 6/18/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 6/18/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:34:22 PM
Creation date
6/18/2026 1:32:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
6/18/2026
Council Approval Date
6/17/2026
End Date
12/31/2029
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Point Industrial Center (EPIC) Bridge
Public Works WO Number
3821-001
Tracking Number
0005272
Total Compensation
$3,602,534.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit J <br />Consultant Claim Procedures <br />The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following <br />This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential <br />claim by the consultant. <br />• Any correspondence that directed the consultant to perform the additional work; <br />• Timeframe of the additional work that was outside of the project scope; <br />the additional work; and <br />• Explanation as to why the consultant believes the additional work was outside of the agreement <br />scope of work. <br />Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the <br />recommendation for federal participation in the claim to the WSDOT Local Programs through the Region <br />Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from <br />agency funds. <br />If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs <br />backup documentation to the consultant to either supplement the agreement, or create a new agreement <br />the agreement is subject to audit. No further action in needed regarding the claim procedures. <br />Agreement Number: <br />Exhibit J Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.