My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KBA, Inc. 6/24/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KBA, Inc. 6/24/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2026 2:33:52 PM
Creation date
6/24/2026 2:33:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KBA, Inc.
Approval Date
6/24/2026
Council Approval Date
6/17/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer, Package 1
Tracking Number
0005277
Total Compensation
$2,520,428.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KBA, Inc. May 5, 2026 <br />S:\Projects\Contracts\Client\Everett\026008-01_WMVD Storm+Combined Sewer CM\Negotiations\Prime_KBA_Negotiations\Supplement 01_Package 1\02600801_Supp- <br />01_Scope_v0.docx 1 of 7 <br /> <br />EXHIBIT A <br />SCOPE OF SERVICES <br />for <br />PGSF WMVD Storm and Combined Sewer Package 1 <br /> <br /> <br />KBA, Inc. (Consultant) will provide Construction Management (CM) services to City of Everett (Client) for <br />the project known as PGSF WMVD Storm and Combined Sewer Package 1 (Project). These services <br />will include consultation, contract administration, field observation, documentation, and material testing, <br />as required during the construction of the Project, as detailed below. <br /> <br />Project Description: <br />The City of Everett (City) Port Gardner Water Quality Program serves to improve water quality in <br />Possession Sound and Port Gardner Bay by reducing combined sewer overflows (CSOs) and providing <br />regional stormwater treatment for more than 200 acres of urban watershed. This program includes the <br />construction of the Port Gardner Storage Facility (PGSF) and the associated West Marine View Drive <br />WMVD conveyance infrastructure (PGSF WMVD Storm and Combined Sewer). PGSF WMVD Storm and <br />Combined Sewer is split into two discrete projects, referred to as Packages 1 and 2. The PGSF WMVD <br />WMVD Storm and Combined Sewer Package 1 consists of construction of various diameter pipelines and <br />structures to convey wastewater and stormwater to the Port Gardner Storage Facility . The PGSF and <br />PGSF WMVD Storm and Combined Sewer projects are scheduled to be operational by December 31, <br />2027. The Designer of Record on this Project is Brown and Caldwell (Designer). <br /> <br /> <br />I. CONSTRUCTION MANAGEMENT SERVICES <br /> <br />A. Consultant Contract and Team Management: Provide overall day-to-day management of the <br />Consultant contract and Team, including: <br /> <br />1. Decide on best modes and frequency of communication with Client and Designer. Liaison <br />and coordinate with Client on a regular basis to discuss Project issues and status. <br /> <br />2. Manage Consultant Team, comprised of Consultant’s staff and its subconsultants, if any. <br />Organize and layout work for Consultant Team. <br /> <br />3. Review monthly expenditures and Consultant Team scope activities. Prepare and submit to <br />Client monthly, an invoice and progress report describing services provided that period. <br />Prepare and submit reporting required by funding source(s), if any. <br /> <br /> <br />Deliverables <br />• Monthly invoices and progress reports <br />• Reporting required by funding source(s ), if any <br /> <br /> <br />B. Preconstruction Services <br />1. Review Contract Documents to familiarize team with Project requirements. <br />2. During Bidding period: <br />a. Assist in analyzing bidder questions, as needed. <br />b. Assist Designer in researching and preparing Addenda, as needed.
The URL can be used to link to this page
Your browser does not support the video tag.