My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix, Inc. 6/22/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Parametrix, Inc. 6/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2026 3:26:37 PM
Creation date
6/24/2026 3:25:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix, Inc.
Approval Date
6/22/2026
Council Approval Date
6/17/2026
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5/US-2 Interim Improvements – Design
Tracking Number
0005279
Total Compensation
$942,676.24
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Scope of Work <br />US 2 Trestle Interim Improvements 8 April 2026 <br /> Up to two conceptual design layouts would be developed for each design package <br />considered as part of the ARR process <br /> Roadside safety features memo – guardrail, barrier, impact attenuators, etc. The Consultant <br />shall confirm selected safety elements with WSDOT NWR Traffic and Maintenance staff. <br /> Conceptual guide signing plan for inclusion in the ARR document. <br />Assumptions <br />Assumptions for this task include: <br /> Up to two conceptual design layouts would be developed for each design package <br />considered within the ARR <br />Deliverables <br />Deliverables for this subtask include: <br /> Roadside Safety Memorandum draft/final <br /> Preliminary signing plan <br />Subtask 02-04 – ARR Documentation <br />The City and Consultant will meet with the ARR support team to confirm the scope and scale of the <br />ARR document. The document will be prepared in accordance with the WSDOT Design Manual <br />550.06 and document the operational and safety analyses conducted in Subtask 02-02 as well as <br />the conceptual signing plan developed in Subtask 02-03. The ARR Methods and Assumptions <br />Document will be amended to document any change in methodology or assumptions. <br />Prepare an ARR based on the agreed-upon scope and scale and the Methodology and Assumptions <br />Memorandum. It is assumed up to four review drafts will be prepared of the ARR, including: <br /> Draft 1 – City review draft <br /> Draft 2 – WSDOT review draft <br /> Draft 3 – FHWA review draft <br /> Final – routed for signature <br />To expedite the review process, up to three (3) review meetings will be held with the Technical <br />Support Team to resolve comments. These focus meetings are in addition to the ARR support team <br />meetings, to address individual agencies comments or to allow for focused discipline discussions <br />(such as discussing traffic data). <br />Assumptions <br />Assumptions for this task include: <br /> Document will be prepared in accordance with the WSDOT Design Manual 550.06. <br />Deliverables <br />Deliverables for this subtask include: <br /> Draft 1, Draft 2, Draft 3, and Final Supplement to the ARR
The URL can be used to link to this page
Your browser does not support the video tag.