Laserfiche WebLink
23. Parking reduction with transportation management plan(EMC 19.34.070.D) <br /> 24. Phase approval and development approval implementing an institutional overlay <br /> zone master plan or approval of minor revisions (can't change use or character or <br /> allow increase in intensity of development) as provided by EMC 19.33.B.060 <br /> 25. Public park development not part of or in conformance with an adopted master <br /> plan or which exceeds the City's SEPA thresholds for categorical exemptions as <br /> provided by EMC 19.33.A.030B <br /> 26. Conceptual site plan review at an applicant's request for projects that do not <br /> otherwise require a land use permit and are not categorically exempt under SEPA <br /> 27. Project review for public projects that are not categorically exempt under SEPA <br /> 28. Proposals required to be reviewed by the Historic Commission in the Historic <br /> Overlay Zone per neighborhood conservation guidelines and historic zoning <br /> overlay standards (not including those listed under administrative review by staff <br /> which is Review Process I) <br /> 29. Reasonable Use Determinations with modification of zoning standards (under <br /> EMC 19.37) <br /> 30. Reestablishment or change in use of nonconforming grocery store as provided by <br /> EMC 19.38.100B(1) <br /> 31. Shoreline permits (less than 1 acre of the project footprint area is within shoreline <br /> jurisdiction) <br /> 32. Stream and wetland filling, modification, and mitigation as provided for in EMC <br /> 19.37 <br /> 33. Transfer of development rights under EMC 19.37.050D <br /> 34. Wetland alteration for Category 1, Category II and Silver Lake watershed as <br /> provided by EMC 19.37.110B (1), (2), and(5) <br /> 35. Wetland mitigation banking approval as provided by EMC 19.37.110C(10) <br /> 36. All other review processes listed in the Zoning Code as Review Process II <br /> 37. All Review Process I and project permit applications that are not categorically <br /> exempt under SEPA <br /> * SEPA threshold determinations frequently include mitigation requirements as <br /> provided for in the SEPA ordinance. Any SEPA condition based on SEPA <br /> substantive authority as provided for in the SEPA Ordinance shall be identified in <br /> the land use permit decision, as provided in this integrated local project review <br /> process. <br /> ** An open public hearing may be required under the following circumstances, <br /> in which case the application shall be processed under Review Process III: (i) a <br /> public hearing is required by EMC 18; (ii) any affected person files a written <br /> request for a hearing with the Planning Department within twenty-one (21) days <br /> of the notice of application (public comment period); or (iii) either prior to or <br /> within the public comment period, the Director or the City Engineer and/or their <br /> designees require an open public hearing. <br /> 14 <br />