Laserfiche WebLink
c. The determination of completeness was procured by misrepresentation or <br /> lack of material disclosure. <br /> In the event that a determination of completeness is withdrawn and the <br /> responsible official determines that additional information is needed to process <br /> the application, the applicant shall be so notified, and the 120 calendar day period <br /> stayed pending receipt of the requested information by the City. <br /> SECTION 2: INTEGRATED PERMIT PROCESS <br /> A. One Project Review Process. The City shall provide a project review process <br /> that is integrated with the SEPA review process to the maximum extent feasible. For <br /> projects that require more than one project permit approval, the SEPA threshold <br /> determination, and all land use permit decisions shall be made concurrently to the extent <br /> permissible by law. To promote integration and avoid duplication, it is the intent of this <br /> process that any studies be used to fulfill all regulatory needs for which they provide <br /> adequate information,regardless of the specific law or requirement that caused their <br /> preparation. Likewise, it is the intent of this process to avoid duplication under different <br /> laws or regulations of measures to avoid or otherwise mitigate the same project impacts. <br /> 1. Individual Procedure Option. Under the individual procedure option, an applicant <br /> may request: (a)processing land use permits separately; or(b)processing land <br /> use and all other project permits including construction permits in a single <br /> consolidated project review process, which may include a request for a designated <br /> permit coordinator. <br /> As set forth in the Chapter 4, Section 1.C, an application that involves two or <br /> more Review Process I, II, or III procedures shall be processed collectively under <br /> the highest numbered procedure required for any part of the application unless the <br /> applicant requests that the application be processed under the individual <br /> procedure option. Based upon the specific content of the application and the <br /> required permits, the Director may grant or deny a request to process the <br /> application under individual procedures for separate permit decisions. If an <br /> applicant elects a single consolidated project review process for all City permits, <br /> as provided by RCW 36.70B.120, the Director may determine the specific scope <br /> and procedures for the project review on the proposed action consistent with this <br /> Ordinance and other applicable City requirements. <br /> 2. Timing of Notice of Application and SEPA Threshold Determination. The <br /> Director shall integrate the timing of the notice of application with environmental <br /> review under SEPA as follows: <br /> a. Except for a determination of significance, the Director may not issue a <br /> threshold determination(where required), or issue a decision or a <br /> 32 <br />