Laserfiche WebLink
1 <br /> J <br /> • <br /> CITY OF EVERETT 2017 TO 2022 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Project PROJECT 4- PROJECT NAME PE R!W CONST. Est 2015-20 LEAD MAP <br /> Number TYPE START START START Expenditures AGENCY NO. <br /> 42 Local Access-SAF 1 BNSF RR safety improvements Jan.17 Jun.16 $600,000 • EVERETT <br /> 43 Local Access-SAF 2 Local Roadway Safety Projects Jan.17 Jun.16 $120,000 • EVERETT <br /> 44 Local Access-SAF 3 Safe Routes to Schools Jan.17 Apr.16 $600,000 • EVERETT <br /> 45 Local Access-PRAM 1 Bridge Rehabilitation Program Jan.17 Jul.16 $3,000,000 • EVERETT <br /> 46 Local Access-PRIM 2 Annual Street Overlay Program Jan.17 Ju1.16 $6,000,000 • EVERETT <br /> 47 Local Access-PRAM 3 Sidewalk repair and replacement Jan.17 May 16 5360,000 * EVERETT <br /> 48 Local Access-PRAM 4 Pavement Marking Project Jan.17 May 16 $210,000 • EVERETT <br /> 49 Local Access-STR 1 106th Pian_SE Improvements Nov.10 Jun.16 I $650,000 * EVERETT 34 <br /> 50 Local Access-STR 2 3rd Avenue SE Street Improvements Jan.17 Apr.16 I $675,000 • EVERETT 35 <br /> 51 Local Access-STR 3 Local Street Improvements Jul.17 May 16 I $560,300 * EVERETT <br /> 52 Local Access-STR - 4 Upper&Lower Ridge Rd.Etr.Improv. Aug.17 Jun.16 I $300,000 • EVERETT 36 <br /> 53 Local Access-STR 5 Simpson Site Access Improvements Aug.17 Jun.16 52,000,03D • EVERETT 37 <br /> 54 Local Access-STR 6 Downtown Streetscape Improvements Jul.14 Jan.15 Apr.16 $8,000 000• EVERETT 38 <br /> 55 Local Access-SIG 1 Traffic Signal Central Controller Replacement Jan.17 Jul.15 $600,000 * EVERETT <br /> 56 Local Access-SIG 2 Traffic Signal Interconnect Jan.17 May.15 $240,000 • EVERETT <br /> 57 Local Access-SIG 3 Traffic Signal Improvements Jan.17 Jun.15 $900,000 • EVERETT <br /> 58 Local Access-SIG 4 Traffic Sign Improvements Jan.17 Jun.15 $500,000 • EVERETT <br /> 59 Local Access-NEI 1 Neighborhood Block Grants Jan.17 May.15 $360,000 • EVERETT <br /> 60 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects Jan.17 May.15 $2,400,000 'I EVERETT <br /> 61 Local Access-NEI 3 Residential Sidewalks Jan.17 May.15 $2,400,000 • EVERETT <br /> 64 Local Access-NM 1 36th StreetBNSF Rail Line Ped/Bike Crossing Jan.08 Nov.16 Jun.18 $2,800,000 • EVERETT 39 <br /> 65 Local Access-NM 2 Smith Island Bike/Ped improvements Jan.10 Jan.16 May 18 $1,000,000 • EVERETT 40 <br /> 66 Local Access-NM 3 Bicyle Master Plan Implementation Jan.16 Jan.16 $200,000 • EVERETT <br /> 67 Local Access-NM 4 Riverside Business Park Ped trait Apr.09 Apr.16 I $700,000 • EVERETT 41 <br /> 68 Local Access-NM 5 West/East Marine View Drive Bike-Ped Improvements Aug.09 Apr.16 $500,000 • EVERETT 42 <br /> 69 Local Access-NM 6 47th Street Pedestrian Improvements Jan.17 Jun.16 $500,000 • EVERETT 43 <br /> 70 Local Access-NM 7 Pigeon Creek No.1/BNSF Crossing Jan.10 Jul.16 Jan.17 $925,000 • EVERETT 44 <br /> 71 Local Access-NM 8 Henry Jackson Park Ped Bridge Jan.07 May.16 Jul.20 $2,700,000 • EVERETT 45 <br /> 72 Local Access-NM 9 Grand Ave./N.Marina Ped-Bike Connection Jan.15 Jan.16 May.17 $1,050,000 • EVERETT <br /> 73 Local Access-NM 10 Shoreline Access Improvements Apr.15 _ Jan.16 $2,400,000 • EVERETT <br /> 74 Local Access-NM 11 Snohomish River Bike and Ped.Bridge Nov.01 Jan.16 $9,000,000 • EVERETT 46 <br /> 75 Local Access-NM 12 Pigeon Creek Road No.1 Improvements Apr.17 Jan.18 $1,000,000 • EVERETT 47 <br /> 76 Local Access-NM 13 Lowell Snohomish River Rd.Bike/Ped Connection May.15 Aug.16 Jan.17 $1,500,000 • EVERETT 48 <br /> 77 Local Access-NM 14 Everett Non-Motorized Projects May.15 Aug.16 Jan.17 $760,000 • EVERETT <br /> 78 Local Access-NM 15 Riverfront District Bike/Ped Paths Jul.09 Jan.16 $500,000 • EVERETT <br /> - <br /> 79 Local Access-NM I 16 Interurban Trail Bike/Ped Path Improvements Jut 10 Jan.16 $500,000• EVERETT <br /> 80 Local Access-NM ( 17 Bicyle Detecfion Signals Jan.16 Jan.17 $200,000• EVERETT <br /> 81 Local Access-NM 18 ADA Signals Jan.16 Jan.17 $200,000• EVERETT I <br /> 82 Local Access-NM 19 ADA Ramps Jan.16 Jan.17 $200,000• EVERETT <br /> $57,130,000 <br /> NOTE:Projects shown in bold type(if any)were not included in the 2016-2020 Six-year TIP. <br /> •A portion or all of the funding for this project has not yet been committed. <br /> Codes: SAF=Safety; PRAM=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement; <br /> NEI=Neighborhood Projects; LS=Landscaping Project NM=Non-Motorized Improvement <br /> 21 <br />