My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 2 Reid Middleton
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Amendment 2 Reid Middleton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 11:38:24 AM
Creation date
7/6/2016 11:38:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton, Inc.
Approval Date
6/29/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall No. 6 Reroute
Public Works WO Number
UP 3583
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$64,017.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHANNON & WILSON, INC. <br /> TABLE 1 <br /> FEE ESTIMATE <br /> Labor Estimate(Hours) <br /> Vice Senior Engineer <br /> Task President Engineer 11 II TOTAL <br /> 1.0 Contractor Submittal Review <br /> Pipe Pile Submittal 0.5 3 3.5 <br /> Tieback Submittal 0.5 3 3.5 <br /> Dewatering Submittal 4 4 <br /> 2.0 Geotechnical/Environmental Construction Observation <br /> Preconstruction Meeting 2 2 4 <br /> Observation of Mass Excavation,Subgrade <br /> Observation,and Environmental Screening(assumed 50 50 <br /> 1 week of excavation observation @ 10 hours per day <br /> including travel time and report preparation) <br /> Tieback Installation(assumed I week @ 10 hours per 50 50 <br /> day including travel time)and report preparation <br /> Tieback Testing(assumed 1 hour per proof test,2 <br /> hours perpeformance test, and 1 hour for test 19 19 <br /> interpretation and report preparation) <br /> Pipe Pile Driving Criteria(WEAP Analysis) 1 4 5 <br /> Pipe Pile Installation(assumed 1 day @ 10 hours <br /> including travel time and report preparation) 10 10 <br /> Placement and Compaction of Backfill(assumed I <br /> week @ 10 hours per day including travel time and 50 50 <br /> report preparation) <br /> 2.0 Office Review, Supervision, and Consulting Services <br /> Field Activity Report Review 8 8 <br /> Environmental Testing/Analytical Results Review 4 10 14 <br /> Groundwater Monitoring Review 1.5 1.5 <br /> Additional Project Meetings(assumed conference 2 2 <br /> calls) <br /> Site Visits-Review of Unanticipated Conditions 2 2 <br /> Column Totals(hours) 21.5 14 191 226.5 <br /> Notes: Actual construction observation charges will be based on the actual time spent to provide the required services. In <br /> the above estimate,we assumed that only one field representative at a time would be required to observe the construction <br /> tasks. <br /> RCRA=Resource Conservation and Recovery Act <br /> WEAP=Wave Equation Analysis Pile <br /> 21-2-62768-001-L1-T1/wp/lkn Page 2 of 2 21-2-62768-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.