My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2567-01
>
Ordinances
>
Ordinance 2567-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2014 3:46:36 PM
Creation date
4/9/2014 3:46:35 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2567-01
Date
12/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , '... . <br /> EXHIBIT "A" <br /> Section III (Utilities), C. (Utility Summary), 1. (Gas), page CF-28 of the Everett <br /> Comprehensive Plan, shall henceforth read as follows: <br /> 1. Gas. <br /> Natural gas service is provided to the City of Everett through franchise by Puget <br /> Sound Energy. Washington Natural Gas and Puget Sound Power and Light <br /> merged in 1997 to form Puget Sound Energy (PSE). PSE is regulated by the <br /> Washington State Utilities and Transportation Commission. As of November, <br /> 2001 the company serves approximately 11,500 active meters within the City <br /> Limits. <br /> New natural gas customers are served either as new development occurs, or <br /> when a fuel conversion is requested. In either case, service is extended upon <br /> demand on a case by case basis according to approved tariffs. Increased <br /> system capacity may be required as demand for natural gas increases and <br /> population growth continues. System reinforcements can be accomplished by <br /> such methods as uprating the operating pressure of an existing system, <br /> extending a new line, or looping an existing system to improve pressure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.