Laserfiche WebLink
Slough,the waterward boundary is the ordinary high water mark. The eastern boundary <br /> is the city limit. <br /> 4. Langus Riverfront Park (See Figure 4.19): The cutoff tidal channel below the <br /> ordinary high water mark. <br /> 5. Ferry Baker Island and Weyco Island in the Snohomish River (See Figure 4.19): <br /> All of Ferry Baker Island and Weyco Island above the ordinary high water mark. <br /> 6. City-owned parcel located southwest of Weyco Island and north of I-5 (See Figure <br /> 4.19): That area owned by the City of Everett contiguous to the west bank of the <br /> Snohomish River in the SW-1/4 of Section 16-29-5 (parcel number 1629 053 002 00) <br /> within 200 feet of the OHWM or 200 feet of the floodway, whichever is further inland. <br /> 7. Simpson Site (Figure 4.14): Bigelow Creek and the Category 1 wetlands and their <br /> buffers required by the SMP, along with the riparian corridor along the entire east edge of <br /> the property required by the SMP. <br /> The waterward boundary is the ordinary high water mark of the Snohomish River <br /> provided that any portion of the northern Category 1 wetland between the OHWM and <br /> the Aquatic Conservancy area is also Urban Conservancy. The western boundary for the <br /> northern Category 1 wetland and Bigelow Creek is the line that corresponds to the <br /> existing west edge of the Burlington Northern right-of-way and any wetlands that extend <br /> beyond the west edge of the right-of-way. Interior boundaries are the edge of the buffers <br /> adjacent to Bigelow Creek and the Category 1 wetlands required by the SMP. The <br /> western/interior boundary for the riparian corridor along the River is 200 feet from the <br /> floodway, or 200 feet from the OHWM, or the buffer required by the SMP for the <br /> wetlands in the corridor, whichever is further west. <br /> Vision Statement <br /> The Category 1 wetlands and the riparian corridor on the Simpson site will <br /> be for conservation, except for transportation and utility access. The <br /> riparian corridor along the river will be preserved with public access <br /> including a trail. <br /> 8. East of Rotary Park and north of Lowell-Larimer Road (See Figure 4.20): The <br /> waterward boundary is the ordinary high water mark. The southern boundary is the north <br /> edge of the Lowell—Snohomish River Road. The west boundary is Rotary Park. The <br /> east boundary is the City limit. <br /> 9. Portions of the Marshland Site (See Figure 4.20): The Spane wetland mitigation site; <br /> the forested wetlands in 1997 SEWIP AUs numbered 193, 196, 202; and the Simpson <br /> Paper Co. landfill surrounded by SEWIP AU 196. <br /> 10. Lake Stickney (See Figure 4.15): All lands on the north and west portions of Lake <br /> Stickney between the west property line of parcel number 3740 000 027 00 (lot 27 of the <br /> 5 <br />