Laserfiche WebLink
Pellco Construction Inc <br /> ' APWA-WA Division 1 Committee rev. 1/8/2016 <br /> Proposal for Incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1, 2016(SHB1695), the Bidder shall <br /> propose below, the total percent of construction aggregate and concrete materials to be <br /> incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br /> of Recycled Material, of the Standard Specifications. <br /> Proposed total percentage: / ~J percent. <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br /> 1-06.6 of the Special Provisions. <br /> Bidder: Pellco C �Inc <br /> Signature of Authorized Official: i ,� Michael J Pellitteri <br /> Date: 4. .2t.)16 <br /> 'rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see vwrw.bxwa.com Always Verify Scale ._. <br />