My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Project: <br /> Change Order No. <br /> Change Order Effective Date: <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> ' 3. The duration of the Contract, and contractually scheduled completion date, shall be <br /> adjusted to the extent described in this Change Order. <br /> ' 4. Unless the Contractor timely and properly follows the procedures in the contract for <br /> ' seeking further equitable adjustment of time and compensation, including, but not <br /> limited to, delays, impacts, inefficiencies, overhead, and direct and indirect costs, and <br /> except as otherwise expressly provided herein, the Contractor will be barred from (a) <br /> asserting any claim for further adjustment of time and compensation arising out of, or <br /> relating to, the charges described in this Change Order or work described in Exhibit A <br /> and (b) asserting an equitable adjustment of time or price arising earlier than the date <br /> ' of this Change Order. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required by the <br /> Contract Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after the <br /> date of this Change Order, but relates to work performed prior to the date of this <br /> Change Order, then this provision does not apply if the Contractor timely and properly <br /> submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> ° a } 4 ��� ^" Sm.R47 � .+ .' ' �,nR 'w x 77i r > ➢+ Y ��' ,Ij�M +rero <br /> • !`� h' r �` fA ll k u 'h,1 � + V f-.411 <br /> a fa9h ' <br /> � �➢ '�' +"P4 ,� ri�h� '♦r;:a �-"e �pa� r��TYa� '�'��'+ vl� `� +. mir k�'q r`J4.�rs �I <br /> Attest: Approved As to Form: <br /> I <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Manager Department Director <br /> Manager (if applicable) (if applicable) <br /> applicable) <br /> Date: <br /> Date: Date: Date: <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.