My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 (March 13, 1995) 68 I <br /> 2 Removing Miscellaneous Traffic Items 68 <br /> 3 MATERIALS 69 <br /> 4 (January 3, 2011) 69 <br /> 5 ESAL's 69 <br /> 6 HOT MIX ASPHALT 69 <br /> 111 <br /> 7 Compaction 70 <br /> 8 PAYMENT 71 <br /> 9 (August 5,2013) 71 <br /> 10 Asphalt Cost Price Adjustment 71 <br /> 11 STRUCTURAL EARTH WALLS 73 <br /> 12 MATERIALS 73 <br /> 13 6-20 MODULAR CONCRETE BLOCK WALL 73 1 <br /> 14 6-20.1 DESCRIPTION 73 <br /> 15 Submittals 73 <br /> 16 6-20.2 MATERIALS 74 <br /> 17 Masonry Unit Materials 74 <br /> 18 Base Leveling Pad: 74 <br /> 19 Unit Fill• 74 <br /> 20 6-20.3 CONSTRUCTION REQUIREMENTS 75 <br /> 21 Foundation Soil Preparation: 75 <br /> 22 Unit Installation: 75 1 <br /> 23 Cap Installation• 76 <br /> 24 6-20.4 MEASUREMENT 76 <br /> 25 6-20.5 PAYMENT 76 <br /> 26 7-05.3(S) FURNISH AND INSTALL SOLID LID 77 <br /> 27 7-05.3 CONSTRUCTION REQUIREMENTS 77 <br /> 28 7-05.5 PAYMENT 77 I 29 7-05.3(6) FURNISH AND INSTALL VANED GRATE 78 <br /> 30 7-05.5 PAYMENT 78 <br /> 31 8-01.3(2)B SEEDING AND FERTILIZING 79 1 <br /> 32 8-01.3(2)D Mulching 80 <br /> 33 (. <. .) 80 <br /> 34 ROADSIDE RESTORATION 80 <br /> 111 <br /> 35 DESCRIPTION 80 <br /> 36 Bark or Wood Chip Mulch 81 <br /> 37 PAYMENT 81 <br /> 38 8-02.4 MEASUREMENT 81 <br /> 39 8-02.5 PAYMENT 81 <br /> 40 8-04 CURBS,GUTTERS,AND SPILLWAYS 82 <br /> 41 8-04.1 DESCRIPTION 82 <br /> 42 8-04.3 CONSTRUCTION REQUIREMENTS 82 <br /> 43 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways 82 <br /> 44 8-04.3(2)Painted Traffic Curb 82 <br /> 45 8-04.5 PAYMENT 83 <br /> 46 8-14 CEMENT CONCRETE SIDEWALKS 83 1 <br /> 47 8-14.3 CONSTRUCTION REQUIREMENTS 83 <br /> 48 8-14.3(1) Excavation 83 <br /> 49 8-14.3(6) Curb Ramp 84 1 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021);COE#3540 SP-2 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.